7.1.5.2 Measurement traceability
-
Is there any calibration gear on site up to date?
8.2 Emergency prep & response: ENVIRONMENTAL
-
What process or procedure have you in place for any potential emergency situation or accident on site regarding environmental issues i.e. Spill kit?
7.2 competence
-
CSCS/ECS/NICIEC cards available and in date?
-
Is there a supervisor on site?
-
Site induction training completed?
8.5.2 Identification and traceability
RAMS
-
RIsk assessment, method statement or Coshh available on site?
Daily briefing document (DABS)
-
DABS available and signed?
Equipment register
-
Equipment register available on site?
Permit to work procedure
-
On site procedure understood and explained?
Tool box talks
-
Has tool box talks been carried out on site?
8.5.4 Preservation
-
Has the client signed off any of the work?
-
Have all drawings been supplied and used during installation?
-
Is the drawing the correct revision?
-
Are faulty goods and surplus goods segregated?
-
Is there any faulty goods, are these appropriately labelled?
-
If there is faulty goods, is there adequate information on the fault?
-
Is there any surplus goods , are these appropriately labelled?
-
Are the goods adequately packed?
-
Are materials held on site identifiable and traceable?
-
Is there any form of checking quality of work internally with the company?
-
Has the sub contractor filled in a site test procedure (sat 1)?
7.1.3 Infrastructure
-
PASMA - Tower scaffold being used?
-
IPAF - Mobile elevating work platform being used (MEWP)?
-
Personal Protection Equipment (PPE) Hard hat safety glasses safety footwear safety gloves/hand protection high vis vest Full body harness Work positioning lanyard
-
240v - 240v equipment being used on site?
-
Has the electrical items pat tested and up to date?
7.3. Awareness: ENVIRONMENTAL
-
Has the subcontractor had on site environmental awareness in regards to waste management during site induction/toolbox talks?
7.4.3 Communication: ENVIRONMENTAL
-
Is the subcontractor aware of the process for receiving and responding to relevant external communication regarding environmental?