Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Condition of material as delivered to site
-
Are the goods adequately packed?
-
Has the goods been stored appropriately on site?
-
Are materials held on site identifiable and traceable?
Quality of installation of work
-
Has the client signed off any of the work? Is there any evidence of this?
-
Is the quality of the subcontractor to colts standards?
Quality of supervision
-
Is there a supervisor on site or is there regular visits by a supervisor?
-
If not, Is there any form of checking quality of work internally of their company?
Paperwork and drawings
-
Have all drawings been supplied and used during installation?
General comments
-
Are there any surplus goods , are these appropriately labelled
-
Are there any faulty goods, are these appropriately labelled
-
Are the faulty goods and surplus goods segregated?
-
If there are faulty goods, is there adequate information on the fault
-
Are there any calibration gear on site?, are they up to date?
-
Has the electrical items pat tested and up to date?
Training
-
What training has the Engineer had?
Other
-
Other comments?
Results
-
Non conformities
-
Observations