Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Condition of material as delivered to site

  • Are the goods adequately packed?

  • Has the goods been stored appropriately on site?

  • Are materials held on site identifiable and traceable?

Quality of installation of work

  • Has the client signed off any of the work? Is there any evidence of this?

  • Is the quality of the subcontractor to colts standards?

Quality of supervision

  • Is there a supervisor on site or is there regular visits by a supervisor?

  • If not, Is there any form of checking quality of work internally of their company?

Paperwork and drawings

  • Have all drawings been supplied and used during installation?

General comments

  • Are there any surplus goods , are these appropriately labelled

  • Are there any faulty goods, are these appropriately labelled

  • Are the faulty goods and surplus goods segregated?

  • If there are faulty goods, is there adequate information on the fault

  • Are there any calibration gear on site?, are they up to date?

  • Has the electrical items pat tested and up to date?

Training

  • What training has the Engineer had?

Other

  • Other comments?

Results

  • Non conformities

  • Observations

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.