Title Page

  • Location

  • Conducted on

  • Prepared by

Existing Decking Removal

  • Has the existing timber decking and all associated fixings been removed?

Installation of the new Aluminium Decking

  • Have all decking boards been cut to matching lengths?

  • Have all decking boards been installed with a 6mm gap according to the construction issue drawings?

  • According to the construction issue drawings, have all fixings and clips been installed in the correct positions?

  • Has the final board been cut parallel and installed correctly?

  • <br>Has the final board been cut and installed free from any sharp edges?

Completion

  • Has the area been left clean and tidy?

  • Has all debris netting been removed from the underside of the balcony steel?

  • Has the balcony door been free from all obstructions and clear to open?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.