Information

  • Client / Site

  • undefined

undefined

  • Location
  • Prepared by

  • DATE OF INSPECTION

SITE WALK

INSPECTIONS

  • HAS ALL METSEC/SFS BEEN INSTALLED TO ALL LEVELS.

  • HAS ALL WINDOW FRAMES BEEN INSTALLED TO ALL LEVELS.

  • HAS THE GLASS BEEN INSTALLED TO ALL LEVELS.

  • IS THE HOIST RUNNING TO ALL LEVELS FROM GF-L6.

  • WHAT LEVELS HAS BEEN HANDED OVER FOR 1ST FIX DRYLINING TO START.

  • DELAYS ONSITE TO BE RECORDED BY EMAIL.

  • ANY OTHER TRADES WORKING IN THE HANDED OVER AREAS FROM BERKELEY-GROUP TEAM.

  • HAVE ALL MATERIALS BEEN LOADED OUT ON THE LEVELS.

  • INSPECTED BY

  • DATE

  • ADDITIONAL COMMENTS

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.