Title Page
-
Address of inspection
-
DA number
-
CC/CDC No.
-
Date of inspection
-
Owner
-
Builders Contact
Inspection Type
-
Inspection Type
-
Swimming Pools
-
Driveways
-
Plumbing Permit
-
Final Inspections
Notes from inspection
-
Notes
Result of inspection
-
Building works are satisfactory
-
Satisfactory - subject to additional requirements
-
Unsatisfactory - Reinspection required
Principal certifier
-
Andrew Clark - BDC 1000
-
Nick Armstrong - BDC 3240
-
Riley Farrell - BDC 05132
Individual Certifier Details
-
Andrew Clark - BDC 1000
-
Nick Armstrong - BDC 3240
-
Riley Farrell - BDC 05132
Signature
-
Signature
DA Conditions
-
Is safety hoarding fence installed inside site boundary?
-
Has site toilet been provided?
-
Has PCA sign been erected on fence?
-
Is builders details provided?
-
Is waste storage area on site?
-
All construction site management plan items installed?
-
All Council assets within road reserves condition?
-
Has sediment fence been erected if required?
-
Is an all weather access provided?
-
Has notice of commencement been returned?
-
Referenced documents - Engineers/site plan
-
Is the proposed site location consistent with approved plans?
-
Are boundary setbacks acceptable?
-
Are falls/ground levels consistent with approved plans?
-
Has all top soil been removed from building area?
-
Is foundation material compacted to provide solid bearing capacity?
-
Does the soil at base of piers/footing have good bearing?
-
High-impact moisture resistant vapour barrier installed - lapped 200mm or taped?
-
Is the slab 150mm thickness minimum?
-
Is the mesh size in accordance with engineers detail?
-
All mesh clearances acceptable? 40mm to formwork?
-
Has steel been lapped correctly?
-
Is re-entrance bars required? have they been installed correctly?
-
Has the slab been broken for control or saw cuts?
-
Have step downs been provided?
-
Has edge rebate been installed?
-
Has bar chairs been provided with no spacing greater than 800mm centres?
-
Is trench mesh required?
-
Internal re-entrant bars installed minimum 2m length?
-
Is trench mesh to engineers detail?
-
Are footings correct depth/width?
-
Are piers/footings free from debris, water and loose earth?
-
Have termite protection been installed? Collars on drainage/ableflex?