Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Do you have RAMS for the Site
-
Is there an Asbestos Registar On Site
-
Do You Require a Permit to Work?
undefined
Works Completed
-
Have you installed any Copper data cabling?
-
How Many Cables Have you Installed
-
Have All Cables Been Labelled at the Outlet
-
Has the Cabling been terminatted at the Patch Panel
-
Provide an Example Picture of Cabling Route (Containment/Ties Wraps)
-
Has all Copper Cabling Been Fluke Tested
-
Have You Installed any Fibre Optic Cabling
-
What Fibre Links Have You Installed
-
Has All Fibre Cabling Been Terminnatted
-
How Many Cores in Total Have Been Terminatted
-
Have the Fibre Panels Been Labelled
AP Installation
-
Have you Installed Any Wireless Acess Points
-
AP Location
-
AP Serial Number
-
AP MAC Address
-
Take Picure of AP in Position
Site Sign Off
-
Have You Cleared all Materials & Equipment From SIte
-
Is there any additional works required?
-
Photos of completed works (Multiple Picutres)
-
General Comments - (e.g. issues - Need to Report)
-
Signature of site contact that works complete satisfatorily