Title Page
-
Project Name
-
Roof Area
-
Client Representative
-
Date of Inspection
-
Delta Roofing & Cladding Site Supervisor
Section 1: Scope of Works
-
Installation of Internal Ridge
-
Installation of Insulated Gutter System
-
Installation of Composite Roof Panels (Kingspan / equivalent)
-
Flashings, capping's, sealants, and fixings
-
Installation of external ridge
-
Installation of vents in composite roof (if applicable)
Section 2: Visual Inspection & Quality Assurance Checklist
-
SGV15P 20X9 PVC foam tape (or equivalent) fitted to steelwork
-
Internal Ridge installed in accordance specification & layout drawings
-
Gutters installed, aligned, and securely fixed in accordance with approved design.
-
Composite panels installed and fixed in accordance with specification & layout drawings
-
Roof panel joints sealed correctly with appropriate sealants/tapes (6 x 5mm butyl tape sealant and/or Gun grade butyl sealant)
-
Void between roof panels (Parapet) packed with fire resistant canister foam insulation.
-
Closed cell black foam filler
-
0.7mm Precoat steel flashing AL9002 Grey WHTE b/straps sealed with gun grade butyl sealant.
-
End laps, side laps, and fixings inspected
-
Roof penetrations sealed and weather-tight
-
Downpipes connected and free-flowing
-
Protective films removed from all panels
-
All debris and installation waste cleared from roof/gutters
-
Roof area swept and gutters cleaned
-
Snagging completed (if applicable)
Section 3: Documentation Provided
-
Manufacturer’s Warranty (Roof Panels)
-
Manufacturer’s Warranty (Gutters)
-
Installation Certificates
-
Roof Layout & As-Built Drawings
-
Operation & Maintenance (O&M) Manual
-
Inspection/Test Reports