Information
-
Compound Audit
-
Dove Project
-
30.10.2014
-
Nyasha Gazi
-
Dove Project
-
PC Team
Access & Egress
-
Are pedestrian routes clearly marked?
-
Are doorways free from obstructions?
-
Is there adequate lighting?
-
Is there adequate ventilation?
-
Is walkway to compound free from obstructions?
Welfare arrangements
-
Are washing facilities available?
-
Are changing facilities provided?
-
Is seating suitable?
-
Are lockers provided and in good condition?
-
Is soap and other hand cleaner provided
-
Is means of drying hands available
-
Are facilities available to enable heating food and hot water for drinks
General housekeeping
-
Are lidded waste bins available
-
Are the bins emptied (must be emptied at 3/4 full)
-
Is the area cleaned daily?
-
Are floors swept and in good condition
-
Is there adequate storage available
-
Is waste segregated
-
Is waste disposed of correctly
Pest control
-
Are bait boxes in place
-
Have bait boxes been checked
-
Is the area clear of any animal or insect droppings
First Aid
-
First aid facilities available
-
First aiders available on site
-
Emergency number displayed
Fire Prevention
-
Is fire-fighting equipment available
-
Is there a call point available
-
Is fire detection available
-
Are areas free from combustibles
-
Are adequate controls in place
-
Is location of fire assembly point identified
Electrical equipment
-
Has all electrical equipment been PAT tested
-
Is equipment in good condition
-
Are adequate controls in place
-
Is location of fire assembly point identified
Environmental
-
Are hazardous materials stored correctly
-
Are COSHH sheets available
-
Are adequate control measures in place
-
Are procedures in place to deal with spills
-
Are substances disposed of correctly
Sign Off
-
On site representative
-
Auditor's signature