Title Page
-
Conducted on
-
Prepared by
Inspection details
-
Project Name
-
Installer
-
Client
-
Date
-
Area Inspected
-
Fire Rating
Checklist
-
Area within the aperture was cleaned of any debris and any dust from the edges was removed
-
Acoustic Intumescent Sealant applied to all edges of the Batt ensuring that an even cover was achieved over the entire thickness of the Batt
-
Gaps between the Batt and surrounding edges are fully filled
-
Plastic pipework protected correctly using Firestop Pipe Collars or Intumescent Pipe Wraps
-
HS Firestop Compound mixed to a smooth and even consistency
-
Installation carried out when temperatures was between 5℃ and 35℃
-
A minimum depth of 100mm was poured in a single pour to achieve loadbearing capabilities
-
Once filled the HS Firestop Compound was smoothed to produce a professional finish