Title Page

  • Conducted on

  • Prepared by

Inspection Details

  • Project Name

  • Manager

  • Client

  • Date

  • Area Inspected

Conditions

  • 1. All surfaces reasonably dry and protected from weather

Plastering - Application

  • 2. FCL correct as per drawing

  • 3. Rigid angle hangers installed correctly (1200mm centres)

  • 4. MF6 Perimeter channel fixed at 600mm centres into suitable fixing surface

  • 5. MF7 Primary support channel fixed to angle (every 1200mm centres) with correct fixings (13mm wafer)

  • 6. MF5 ceiling furring channels at correct centres (400m or 450mm)

  • 7. MF5 joints overlapping by 150mm min (if applicable)

  • 8. MF5 ceiling furring channels engaging into MF6 correctly

  • 9. Pattresses installed as per drawing (if applicable)

  • 10. Plasterboard installed 90 degrees to MF5

  • 11. Correct plaster board used on underside as per drawing

  • 12. Ensure no MF clashes with services

  • 13. Work area left clean and tidy

  • 14. Completed works undamaged

Sign Off

  • JC Drylining Ltd Signature

  • Main Contractor Signature

COMMENTS

  • JC Drylining Ltd comments

  • Main Contractor returned comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.