Title Page
-
Conducted on
-
Prepared by
Inspection Details
-
Project Name
-
Manager
-
Client
-
Date
-
Area Inspected
Plasterboard - prep
-
1. Surface is clean, dry and suitable to receive Gypsum Plaster
-
2. All plasterboard joints, scrim / paper taped
-
3. Wall and ceiling intersections, scrim / paper taped
Conditions
-
4. All surfaces reasonably dry and protected from weather
Tape & Jointing - Application
-
5. If applicable, movement joints installed corresponding with joints in background
-
6. Angle beads / corner tape fitted plumb and square
-
7. Angle bead, edge bead and stop bead / corner tape - mitres correct
-
8. Jointing coats applied
-
9. Jointing rubbed down
-
10. All electrical boxes cleaned out
-
11. Skirting line cleaned without snots
-
12. Work area left clean and tidy
De-snag after mist coat / Making Good
-
13. Imperfections highlighted and filled with filler
-
14. Filler rubbed down
-
15. Work area letf clean and tidy
Sign Off
-
JC Drylining Ltd Signature
-
Main Contractor Signature
COMMENTS
-
JC Drylining Ltd comments
-
Main Contractor returned comments