Plasterboard - prep
-
1. Surface is clean, dry and suitable to receive Plaster
-
2. All plasterboard joints, scrim taped
-
3. Wall and ceiling intersections, scrim taped
Conditions
-
4. All surfaces reasonably dry and protected from weather
Plastering - Application
-
5. If applicable, movement joints installed corresponding with joints in background
-
6. Angle beads / corner tape fitted plumb and square
-
7. Angle bead, edge bead and stop bead / corner tape - mitres correct
-
8. Skim coat applied
-
9. All electrical boxes cleaned out
-
10. Skirting line cleaned without snots
-
11. Work area left clean and tidy
De-snag / Making Good
-
12. Plastering imperfections highlighted, filled and rubbed down
-
13. Work area left clean and tidy