Title Page

  • Conducted on

  • Prepared by

Inspection Details

  • Project Name

  • JC Drylining Site Supervisor/Manager

  • Client

  • Date

  • Area Inspected

Fire Door Installation

  • 1. Door Reference Number

  • 2. Location

  • 3. Fire Rating

  • 4. Fire Doorset Manufacturer

  • 5. Date Installed

  • 6. Door Installer

Fire Door Installation - Stage 1

  • 7. Frame installed plum and square

  • 8. Frame packers installed approx 10mm from the frame edge to allow for the fire foam or fire acoustic mastic

  • 9. Gaps & voids larger than 20mm filled with a solid infill (plasterboard or timber with the same density as the frame)

  • 10. Door frame fixing locations at 100mm from top and 100mm from bottom. The remaining fixings at max 500mm centres. 5no fixings per leg is recommended for the max frame stability

  • 11. If frame wider than 140mm additional parallel fixings installed

  • 12. Screws should penetrate at least 40mm into the wall structure

  • 13. Door stops installed to accommodate the smoke seal allowing 3mm from the line stop to the door face. For fire only doors door face set against the stop

  • 14. If doors needed to be trimmed to suit the pre-fitted frame, equal amounts taken from both sides of the door (maximum of 3mm per edge is permited)

  • 15. If height reduction required must be taken from the bottom of the door

  • 16. Correct fitting and tolerances checked. 3mm margin around the door on its closed position

  • 17. Hinges, Door Closer, Interdens, Locks/ Latches all correctly fitted and left in working order

Stage 1 - SIGN OFF

  • 18. JC Drylining Ltd Signature

  • 19. Main Contractor/Client Signature

Fire Door Installation Stage 2

  • 20. Intrumescent and Sealant between frame and wall structure. Acoustic doorsets require wadding or rockwool. An even coat of acoustic mastic should be applied

  • 21. Under-door (threshold) gaps in accordance with the manufacturer's installation instructions

  • 22. Architraves installed once the smoke, acoustic & fire elements have been documented

  • 23. Fire door signage fitted

  • 24. Drop seals on higher DB rated doorsets should be adjusted to suit the final floor finish

  • 25. Intrumescent fire seals installed after decoration

  • 26. Smoke seals installed after decoration

SIGN OFF

  • 27. JC Drylining Ltd Signature

  • 28. Main Contractor/Client Signature

INSTALLATION CHECKLIST DEVELOPED IN LINE WITH: BS 8214: 2016, BS 476: 2022 and BS EN 1366-4: 2021

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.