Title Page
-
Conducted on
-
Prepared by
Inspection Details
-
Project Name
-
JC Drylining Site Supervisor/Manager
-
Client
-
Date
-
Area Inspected / Block / Level / Apartment
Installation
-
1. Is kitchen installed as per drawing?
-
2. Are all items correctly installed as per specification?
-
3. Do all cupboard doors and drawers operate correctly?
-
4. Are all cupboard doors and drawers flush with end panels?
-
5. Are all brackets and hinges level and complete?
-
6. Are door handles secure?
-
7. Are plinths continuous?
-
8. Are all screws correctly installed and flush with surface where needed?
-
9. Is there any damage, chips, scratches?
-
10. Area left clean and tidy
-
11. COMMENTS
SIGN OFF
-
12. JC Drylining Ltd Signature
-
13. Main Contractor/Client Signature