Title Page

  • Conducted on

  • Prepared by

Inspection details

  • Project Name

  • Installer

  • Client

  • Date

  • Area Inspected

  • Fire Rating

Checklist

  • Area within the aperture was cleaned of any debris and any dust from the edges was removed

  • Acoustic Intumescent Sealant applied to all edges of the Batt ensuring that an even cover was achieved over the entire thickness of the Batt

  • Gaps between the Batt and surrounding edges are fully filled

  • Plastic pipework protected correctly using Firestop Pipe Collars or Intumescent Pipe Wraps

  • HS Firestop Compound mixed to a smooth and even consistency

  • Installation carried out when temperatures was between 5℃ and 35℃

  • A minimum depth of 100mm was poured in a single pour to achieve loadbearing capabilities

  • Once filled the HS Firestop Compound was smoothed to produce a professional finish

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.