Information

  • Job name

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Pump ID:

  • Pump ID:

  • Operator Name:

  • Co-Operator Name:

Pump Set Up

  • If pump is set up on road, are cones set up to protect from traffic?

  • Outrigger Pads in place with dunnage stacked as needed?

  • Safe access to hopper for operator and mixer drivers?

  • Pictures of Access

  • Area under hopper clean and clear of spills?

  • Clear of all Overhead utilities 20' Min Clearance?

  • Is radius of pour appropriate for outrigger placement?

  • Safety cables in place at pipe transitions?

  • Transition guard in place?

Site Conditions

  • Operator has all appropriate PPE on?

  • Proper traffic control in place for pumping operation?

  • Safe access to placement area for crews and operator?

  • Housekeeping?

Clean Up

  • If needed are there proper materials available for blow down.

  • Pump clean up situation?<br>

  • Signature of Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.