Check List - Exposed Concrete Fromwork
-
Are the latest " Good for Construction" drawings available?
-
Has the required barricading and safety measures been taken?
-
Are safety measures required for the neighboring construction activities?
-
Has the shuttering material been properly cleaned before use?
-
Is the foam strip around the column starter in place to avoid slurry leakages?
-
Has the shuttering been checked for proper fixing and sufficient support for concreting?
-
Is the shuttering checked for vertical and horizonal alingment
-
Are the required tools available?
- Yes
- No
- N/A
-
Check whether location of expansion joints are as per the drawings?
-
Check for Supports to forms and rigidity of the assembly. Is it ok?
-
Is the old layer of nitobond brushed off?
-
Is the new layer of nitobond applied on the shuttering material?
-
Is the plumb of column checked?
-
Rechecking of cover between main bars and horizontal beading
-
Is the cover maintained during the pour?
-
Is the Protection of top beading checked during pour?
-
Protective covers against rain provided?
-
Availability of Material and Manpower?
-
Availability of sufficient no. of Cube molds?
-
Protective measures to column edge after deshuttering -are they ready?
-
Mode of Concrete
-
Grade of Concrete
-
Total Quantity Of Concrete
-
Date of Concreting
-
Checked By
-
Approved By