Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Check List - Exposed Concrete Fromwork

  • Are the latest " Good for Construction" drawings available?

  • Has the required barricading and safety measures been taken?

  • Are safety measures required for the neighboring construction activities?

  • Has the shuttering material been properly cleaned before use?

  • Is the foam strip around the column starter in place to avoid slurry leakages?

  • Has the shuttering been checked for proper fixing and sufficient support for concreting?

  • Is the shuttering checked for vertical and horizonal alingment

  • Are the required tools available?

  • Check whether location of expansion joints are as per the drawings?

  • Check for Supports to forms and rigidity of the assembly. Is it ok?

  • Is the old layer of nitobond brushed off?

  • Is the new layer of nitobond applied on the shuttering material?

  • Is the plumb of column checked?

  • Rechecking of cover between main bars and horizontal beading

  • Is the cover maintained during the pour?

  • Is the Protection of top beading checked during pour?

  • Protective covers against rain provided?

  • Availability of Material and Manpower?

  • Availability of sufficient no. of Cube molds?

  • Protective measures to column edge after deshuttering -are they ready?

  • Mode of Concrete

  • Grade of Concrete

  • Total Quantity Of Concrete

  • Date of Concreting

  • Checked By

  • Approved By

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.