Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Project Location
-
Location of Pour
-
Time
-
Temperature
Mix Design
-
Add photo or screenshot of Mix Design
-
Add photo or screenshot of engineering spec
-
Max Air Content %
-
Minimum Air Content %
-
Max Slump (inches)
-
Minimum Slump (inches)
-
Max temperature
-
Pour Location
-
Total Yards Poured
-
Batch Time
-
Pour End Time
-
Testing Frequency?
-
Number of Trucks
-
Concrete Truck Ticket
-
Number of Cylinders Made
-
Tremie, Drop or Elephant Trunk?
-
Explain why tremie or elephant’s trunk not used
-
Pump Truck?
-
Concrete Vibrated?
-
Dry or Watered Hole?
-
Water Depth?
-
Quantity of Water Added
-
Add Tests
Test
-
Test Number
-
Air Entrainment
-
Add photo of Air Gauge with test result
-
Slump (inches)
-
Add photo of Slump measurement
-
Temperature
-
Add photo of Temperature Gauge Measurement
Closing
-
Comments/Problems
-
Inspector Signature
-
Customer Representative Signature