Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
undefined
undefined
undefined
undefined
Concrete pumping checklist
Items to be checked by sight manager / supervisor
-
Competency of the pump operator (CPCS card checked)
-
Pump house certificates of foreign inspection and signed maintenance records
-
Correct pump on site as ordered capable of requirements
-
Ground stable and spreader mats used to ensure pumps stability
-
Area clear of proximity hazards e.g. overhead cables, underground services, scaffolding
-
Temporary lighting is available if work will occur during the hours of darkness
-
Correct concrete mix is ordered
-
Banksman appointed if required
-
Designated person appointed to monitor the correct concrete levels in the pump hopper
-
Site manager
Items to be checked by concrete pump operator (CPO)
-
CPO confirms pipeline has been monitored and measured by pump provider and pipes and hoses are fit for purpose
-
CPO confirms pipeline and hose configuration is in accordance with pumps manufacturers operating instructions
-
CPO to insure that blanking heads / plates are never used attached to the end boom collar to move pump with concrete in the line