Concrete pumping checklist

Items to be checked by sight manager / supervisor

  • Competency of the pump operator (CPCS card checked)

  • Pump house certificates of foreign inspection and signed maintenance records

  • Correct pump on site as ordered capable of requirements

  • Ground stable and spreader mats used to ensure pumps stability

  • Area clear of proximity hazards e.g. overhead cables, underground services, scaffolding

  • Temporary lighting is available if work will occur during the hours of darkness

  • Correct concrete mix is ordered

  • Banksman appointed if required

  • Designated person appointed to monitor the correct concrete levels in the pump hopper

  • Site manager

Items to be checked by concrete pump operator (CPO)

  • CPO confirms pipeline has been monitored and measured by pump provider and pipes and hoses are fit for purpose

  • CPO confirms pipeline and hose configuration is in accordance with pumps manufacturers operating instructions

  • CPO to insure that blanking heads / plates are never used attached to the end boom collar to move pump with concrete in the line

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.