Information
-
Job Number
-
Job Name
-
Project Manager
-
Personnel
-
Location
-
Conducted on
-
Prepared by
JOB INFORMATION
-
OSHA 300 forms complete and posted from February 1 - April 30?<br>
-
OSHA and DOL posters posted?
-
Emergency phone numbers posted?
-
Tool box safety talks log up to date?
-
MSDS filed?
-
Work areas properly signed and barricaded?
-
Site Specific up to date
-
Daily Site Inspections up to date
-
HOUSEKEEPING
-
Work areas neat?
-
Projecting nails or screws bent over or removed?
-
Waste containers provided and used?
-
Passageways and walkways clear?
-
FIRE PREVENTION
-
Adequate fire extinguishers, checked and accessible?
-
Phone no. of Fire Department posted?
-
"No Smoking" posted and enforced near flammables?
-
EQUIPMENT
-
Backup Alarm Working?
-
All Glass intact?
-
Seatbelt being used?
-
Rear view mirrors intact
-
-
Fire Extinguisher up to date?
ELECTRICAL
-
Terminal boxes equipped with required covers?
-
Extension wires with bare wires or missing ground prongs taken out of service?
-
Ground fault interrupters being used?
-
Electric cords protected from damage
-
HAND, POWER & POWDER ACTUATED TOOLS
-
Hand tools inspected regularly?
-
Guards in place on machines?
-
Correct tool being used for job at hand?
-
Operators of powder actuated tools licensed?
-
FALL PROTECTION
-
Safety rails and cables secured properly,mid rail and mid chain
-
Safety harnesses worn properly?
-
Employees exposed to fall hazards tied off?
-
Employees below protected from falling objects?
-
Protection from clarifiers in place
-
LADDERS
-
Ladders being used at elevation changes of 19" or more
-
Ladders extended at least 36" above landing?
-
Ladders are secure to prevent slipping, sliding or falling?
-
Ladders with split or missing rungs taken out of service?
-
Stepladders used in fully open position?
-
No step at top two rungs of stepladder?
-
Scaffolds & Scissors lifts
-
Scaffolds inspected daily
-
Erected on sound footing
-
Tied to structure as required?
-
Guardrails,intermediate rails,toe boards,mid chains and screens in place
-
Planking is sound and sturdy
-
Proper access provided
-
No climbing on X-braces or mid or top rails
-
Employees below protected from falling objects
-
FLOOR & WALL OPENINGS
-
All floor openings planked over or barricaded?
-
Perimeter protection in place?
-
Deck planks secure?
-
Materials stored away from edge?
-
TRENCHES, EXCAVATION & SHORING
-
Competent person identified and present?
-
Excavations are shored and sloped back?
-
Materials are stored at least 2' away from trench?
-
Ladders provided every 25' in trench?
-
Equipment is at a safe distance from edge of trench or excavation?
-
MATERIAL HANDLING
-
Materials properly stored or stacked?
-
Containers Properly Marked
-
Employees using proper lifting techniques?
-
Tag lines used to guide loads?
-
Proper number of workers for each operation?
-
WELDING AND BURNING
-
Gas cylinders stored upright?
-
Proper separating distances between fuels & oxygen?
-
Goggles or shields used?
-
Fire extinguishers readily available?
-
Hoses in good condition?
-
Torch being lit with striker
-
CRANES
-
Outriggers extended and swing radius barricade in place?
-
Operator is familiar with load charts?
-
Hand signal charts on crane?
-
Crane operator logs up to date?
-
Employees kept from under suspended loads?
-
Chains and slings inspected and tagged as required?
-
CONCRETE CONSTRUCTION
-
Employees are protected from cement dust?
-
Runways are adequate?
-
Exposed Rebar Capped
-
PERSONAL PROTECTIVE EQUIPMENT
-
Hard hats being worn?
-
Safety glasses being worn?
-
Respirators used when required? Proper respirator documentation available?
-
Hearing protection being worn when required?
-
Traffic vests or high visibility clothing material being worn?
-
Safety Toed Work Boots
-
-
Safety Manager
-
Superintendent