Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
First Contact
-
Event Name
-
Event Date
-
Client Name
-
Client Address
-
Client Phone Numbers
-
Client E-mail
-
Nature of Event
- Rock and Roll
- Live music
- Dance
- Disco
- Private Party
- Corporate Party
- Corporate Product Lauch
- Corporate Event
- Wedding
- Fashion Show
- Theatre
- Musical Theatre
- Church
- Other
-
other - specify
Venue
-
Venue Name
-
Address
-
Contact Names, numbers & e-mail
-
What's included and what is extra?
-
Site plans available from:
-
Site Plan
-
Venue Type
- Theatre
- Open Room
- Shopping centre
- Open-Urban
- Open-Rural
- Hotel Banqueting
- Exhibition Centre
- School Hall
- Church
- Private residence- indoor
- Private Ressidence -outdoor
- Office
- Factory Floor
- Public Space- Indoor
- Public Space - Outdoor
- Other
-
other - specify
-
Staff assessment - are the venue staff ?
-
Competent
-
Friendly
-
Helpful
-
Empowered
-
Building characteristics, construction and type
-
Add media
-
Comments
-
Add media
-
Comments
-
Comments
-
Add media
-
Operational restrictions
-
Access restrictions operational
-
Load in restrictions-Physical - Height/ width/ difficulty / distance/ light levels
-
Parking
-
Parking Comments
-
Access equipment needs
-
Material handling equipment needs
-
House light control
-
Temperature control
Stage
-
Stage construction and cover
-
Comments
-
Crowd Barrier?
-
Comments
-
Mixing position
Power
-
Power 1
- 13a
- 15a
- 16a
- 32a single phase
- 63a single phase
- 125a single phase
- 32a TPNE
- 63a TPNE
- 125a TPNE
- 400a powerlocks
- 660a Powerlocks
- Tails
-
Location / Notes
-
Power 2
- 13a
- 15a
- 16a
- 32a single phase
- 63a single phase
- 125a single phase
- 32a TPNE
- 63a TPNE
- 125a TPNE
- 400a powerlocks
- 660a Powerlocks
- Tails
-
Location / Notes
-
Power 3
- 13a
- 15a
- 16a
- 32a single phase
- 63a single phase
- 125a single phase
- 32a TPNE
- 63a TPNE
- 125a TPNE
- 400a powerlocks
- 660a Powerlocks
- Tails
-
Location / Notes
-
Power 4
- 13a
- 15a
- 16a
- 32a single phase
- 63a single phase
- 125a single phase
- 32a TPNE
- 63a TPNE
- 125a TPNE
- 400a powerlocks
- 660a Powerlocks
- Tails
-
Location / Notes
-
Power 5
- 13a
- 15a
- 16a
- 32a single phase
- 63a single phase
- 125a single phase
- 32a TPNE
- 63a TPNE
- 125a TPNE
- 400a powerlocks
- 660a Powerlocks
- Tails
-
Location / Notes
-
Power 6
- 13a
- 15a
- 16a
- 32a single phase
- 63a single phase
- 125a single phase
- 32a TPNE
- 63a TPNE
- 125a TPNE
- 400a powerlocks
- 660a Powerlocks
- Tails
-
Location / Notes
Rigging
-
Comments
Welfare
-
First Aid
-
Rest area
-
Drinking water
-
Catering
-
Accommodation / crew ( distance from venue if not onsite)
-
Crew Security
-
Toilets
Timings
-
Site access from:
-
TSS on site:
-
Crew Call:
-
Load in:
-
Build start time:
-
Stage complete by:
-
Sound check:
-
Rehearsals:
-
Plot lighting:
-
Doors
-
Show
-
Interval
-
Show down
-
Curfew
-
Load out:
-
Site clear by:
Equipment
-
Lighting
-
Add drawing
-
Sound
-
Add drawing
-
Staging
-
Add drawing
-
Rigging
-
Add drawing
-
Power
-
Add drawing
-
Extra requests
-
Add drawing