Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Those present at Meeting
-
Enter Details of all Persons Present at Meeting<br>
Site General Conditions
-
Freehold
-
Is it a Listed Building? No
-
Is it within a Conservation Area?
-
Has Planning Permission been achieved?
-
Has Listed Building Consent been achieved?
-
Are there any planning restrictions?
-
Has Licensing been achieved?
-
Has a pavement licence been applied for?
-
Is change of use required?
-
Has asbestos survey been carried out yet?
-
Is Landlord Permission required?
-
Is a license to alter required?
-
Is this a developers shell?
-
Are any Rights of Ways required?
-
Does anyone have any access rights over our demise?
-
Have we got an agreed customer occupancy figure?
Architects Report
-
Brief outline of proposals to development team completed?
-
Comments on design proposal recieved?
Site External Questions
-
Have site boundaries and demise been established?
-
Have delivery routes been established?
-
Has main customer entrance been established?
-
Has a DDA level access route been established?
-
Have Fire Escapes been identified?
-
Does the site offer a beer garden or external drinking / smoking area?
-
Has a covered area externally been identified?
-
Has a bin store been identified?
-
Has a plant position been identified?
Building Dilapidations
-
Has existing building been cleared ? ( allowance of 1x 8yd skip can remain )
-
Are any items internally to be retained for use within new scheme? ( including furniture, kitchen equip, cellar equip )
-
Roof condition
-
External walls condition
-
External joinery condition
-
Rainwater goods condition
Internal Considerations
-
Is opening shop front possible?
-
Are opening windows possible?
-
Can we add any further natural daylight opportunities?
-
Can we achieve an open kitchen?
-
Can we achieve an open cellar?
-
Will we achieve a well defined Vertical Drinking Area?
-
Will we have adequate fire escapes?
Positions Discussed and Agreed as Best Position
-
Bar Servary
-
Wash Up
-
Kitchen
-
Fridge and Freezer
-
Cellar
-
Cooled bottle store
-
Wine and Spirit Store
-
Ladies and Gents WC's
-
Cleaners Cupboard
-
Disabled WC
-
Office (check for safe cash route)
-
Staff Room
-
Staff WC
-
Plant Room
-
Storage Rooms
-
AWP Positions
-
Plasma / Drop Down Screen Positions
-
Solid Fuel fire
-
Lift or Ramp positions
Services
-
Is Gas upgrade required?
-
Is Water upgrade required?
-
Report on existing mechanical equipment and any likely issues for scheme.
-
Is Electric upgrade required?
-
Report on existing electrical equipment and any likely issues for scheme.
-
Is there BT lines on site?
-
Will wet heating system be used?
-
Will AC be used?
-
Are we able to incorporate Loznay heat recovery units?
-
Have Air In ducting routes been agreed?
-
Have Air Extract positions been agreed?
-
Has Kitchen Extract ducting route been agreed?
-
Is kitchen filtration required?
-
Has future Maintenance been concidared?
-
Are there any unusual maintenance requirements? ( such as access equipment, permissions, frequency )
-
Has all Mechanical and Electrical related information needed for Planning or Listed consents been submitted?
CDM-Co-Ordinators Report
-
Will project be more than 30 days or 500 person days on site?
-
Will F10 notification be required?
-
Does CDM-C have any concerns over project program?
-
Is there any Asbestos information currently available?
-
Will a full Refurbishment and Demolition asbestos survey be required?
-
Will any specialist surveys be required? ( Such as soils, archeology, arboricultural, dilapidation, structural, historical )
-
Has date for passing all Design Risk assessment information to Architect and CDM-C been agreed?
-
Has CDM-C got any comments on DDA or Access issues?
Structural Engineers Report
-
Does the Structural Engineer have any concerns of existing building condition?
-
Is Structural Engineers advise required for proposed scheme?
-
Has a deadline for structural information required for design and pricing been agreed?
Kitchen Contractors Report
-
Is the proposed area for the kitchen deemed acceptable?
-
Will a standard JDW kitchen specification fit within the space allocated?
-
Has the delivery route been established and agreed as acceptable?
-
Is there any concerns regarding kitchen position and space allowed?
Innserve
-
Is the proposed area for the cellar deemed acceptable?
-
Has the delivery route been established and agreed as acceptable?
-
Will DHL need to carry out a detailed visit to ensure deliveries can be made effectively?
-
Is there any concerns regarding cellar position and space allowed?
Secom
-
Has site visit highlighted any additional security risks that need consideration?
-
Will site have full CCTV coverage within trade area?
-
Will external areas have full CCTV coverage?
-
Has smoke screen position been agreed?
Lift Engineer
-
Does the property have any existing lift equipment that can be used?
-
Is a lift or hoist required?
-
Has a position for lift shaft and pit been agreed?
-
Does the lift shaft or pit have any special requirements?
Draft Development Programme Dates
-
Number of weeks on site agreed
-
Date agreed for full issue of design information pack for pricing ( including any redesigned items )
-
Date agreed for full costed scheme to be returned to Architect
-
Date agreed for JDW cost approval pack to be submitted? ( including Tom Lucas feedback )
-
Asbestos survey date agreed?
-
Has an anticipated Start On Site date been agreed?
-
Initial SOS, BC, and HO dates. ( These may change as more information becomes available )
Sign Off
-
In PDM's opinion is this a well considered scheme?
-
Has the Architect got clear instructions on any changes made during meeting?
-
Have all members of the team got enough information to provide accurate pricing that will not vary at contract stage?