Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Previous Audit Report

  • Has the previous audit report been closed out?

  • Have all previous issues been cleared?

Management Controls

  • Check that a signed copy of Form 10 has been sent to the local HSE office and that a copy is displayed on site.

  • Construction phase plan in place and regularly updated?

  • Ensure a new style Accident Book (which complies with the Data Protection Act) is provided on site and is available to all personnel

Access and Egress

  • Is there safe access and egress to all working areas of the site?

  • Are walkways free from obstructions and stored materials?

Asbestos Management

  • Has an asbestos survey been carried out?

  • Is the removal company licenced?

  • Is the work being carried out in a controlled and safe manner?

Compressed Gasses (e.g. LPG, Acetylene)

  • Are the properly stored in a purpose made cage?

  • Are gasses segregated by type?

Consultation

  • Has a system been established for employees to comment and be consulted on health, safety and welfare issues.

  • Ensure appropriate Tool Box Talks are given to all employees and that the Tool Box Talks are appropriate and relevant to the work being undertaken.

Control of Substances Hazardous to Health (COSHH)

  • Have COSHH Assessments been carried out for all potentially hazardous materials and substances being used on the site.

  • Are material safety data sheets available to assist with COSHH assessments.

Demolition Operations

  • Has the structural stability been checked and are temporary supports in place where required?

  • Is the area barried off and suitably signs in place.?

  • Is there adequate dust suppression where required?

  • Is there sutable noise controls in place?

  • Is material being removed from site on a regular basis and not allowed to accumulate?

  • Are all demolition operatives adiquitly trained, supervised and instructed?

Electrical Equipment

  • Check that all necessary utility services are provided on site before work begins.

  • Ensure that existing services e.g.: electricity cables, gas mains etc have been identified and effective steps have been taken to prevent danger from them.

  • Check that low voltage tools and equipment are being used wherever possible.

  • Check that only 110v CTE hand tool etc are in use.

  • Check that tools and equipment are visually checked and regularly inspected/tested by a competent person. (PAT)

  • Ensure that cables and trailing leads are not trip hazards.

  • Ensure that suitable and sufficient task lighting is provided to enable operatives to safely carry out their work.

Excavations/Earthworks

  • Ensure that checks are made to determine the presence of any buried services before and during all excavation works.

  • All excavations should be carried out in accordance with a detailed method statement s and permit to dig. Is there a permit to dig?

  • Check that there is adequate support and propping for the excavation, or whether it has been sloped or battered back to a safe angle.

  • Check that there is safe access into the excavation (i.e.: a sufficiently long and secured ladder).

  • Check that barriers or other protection to stop people/vehicles falling in are in place.

  • Ensure that the excavation is regularly inspected by a competent person and that a record of such inspections is maintained.

Fire Risks and Management

  • Ensure there are emergency procedures for evacuating the site in case of a fire, flood, explosion etc.

  • Ensure all staff know what these procedures are and that they form part of the site induction.

  • Check that there is an adequate means of raising the alarm, and that it is regularly tested.

  • Ensure that there are adequate escape routes and that these are kept clear of obstructions.

  • Ensure that the quantity of flammable materials, liquids and gases are kept to a minimum and are adequately stored.

  • Check that suitable fire extinguishers are provided and that they are maintained and in a good condition.

  • Check that all fire extinguishers have had an annual inspection.

First Aid

  • An appropriate number of trained and qualified first aiders should be available on the site.

  • The location of the first aid box should be indicated on the site notice board and the door of the room in which it is contained. Are they clearly indicated?

  • Be checked and replenished on a regular basis.

Housekeeping

  • Ensure Debris is not be allowed to collect around the site.

  • Ensure materials are stored in an appropriate manner so as not to cause damage to or a weakening of the material.

Induction

  • Ensure all staff receive a site specific safety induction before starting work.

  • Are all visitors including the client representatives being inducted?

Lifting Operations/Equipment

  • Have all lifting operation got a valid lifting plan?

  • Ensure that all lifting equipment has been tested and installed by a competent person and is regularly maintained and inspected.

  • Check that the operators are trained and competent.

Low Level Access Including Steps and Podiums

  • Are podiums used before steps are allowed?

  • Are podiums free from defects?

  • Are steps class 1 as defined in EN131?

  • Is there a risk assessment in place for the use of steps?

Manual Handling

  • Ensure that a manual handling risk assessment has been completed wherever regular lifting of heavy loads is required.

  • Check the suitability of using wheelbarrows, hoists, telehandlers and other plant or machinery so that manual handling of heavy objects is kept to a minimum.

Mobile Scaffold Towers

  • Check that proprietary tower scaffolds have been erected and are being used in accordance with the suppliers instructions.

  • Check that the wheels of any tower scaffold have been locked when in use and check that the platform is empty when being moved.

  • Are they tagged safe for use?

Occupational Health, HAV'S, Noise and Associated Health Risks

  • Check that exposure to HAV has been reduced as much as possible by selecting suitable work methods and Plant.

  • Noise on site to acceptable levels?

  • Health surveillance available?

Permits to Work

  • Ensure all Work Permits have been checked and reviewed and are valid for the work conditions.

  • Ensure all contractors are working in accordance with permits.

Personal Protective Equipment (PPE)

  • Ensure that it is suitable for the type of work being undertaken.

  • Ensure all staff and visitors are wearing minimum correct P.P.E including Hi-Viz vests or jackets, boots and hard hats.

Plant & Equipment

  • Ensure that tools and equipments are stored correctly to avoid damage to the equipment and persons.

  • Check that all dangerous parts are guarded e.g. gears, chain, drives, projecting engine shafts etc.

  • Check that tools are 110 volt and that a residual current device (RCD) is used for additional protection.

  • Ensure all Plant and Machinery is inspected on a weekly basis by a competent person and recorded in a Plant Inspection Register.

  • Are all plant operators trained and hold a valid plant operators card for the categories being operated?

Registers and Records

  • Check the site Inspection Registers for items such as scaffolding, excavations, coffer dams, plant and other equipment have been completed in a timely fashion.

Risk Assessments and Method Statements

  • Ensure all Method Statements have been prepared by a competent person and have been checked, reviewed and signed.

  • Are method statements adequate and suitable for the task?

  • Does the method statement offer the necessary controls and required level of protection?

  • Ensure all contractors are working in accordance with the method statement.

Scaffolding/Working platforms

  • Check that any scaffold erection, alteration or dismantling is carried out by a competent person.

  • Ensure that a competent person inspects the scaffold regularly, at least once a week; and always after it has been altered, damaged and following extreme weather.

  • Are scaffold tags being utilised?

  • Ensure that these inspections are adequately recorded.

  • Are all scaffolds and working platforms sutable?

Security

  • Are the public fenced off or otherwise protected from the work?

  • Is the perimeter fence secure and un-damaged?

  • Are all gated secured?

Traffic Management

  • Are traffic management arrangement suitable and sufficient ?

  • Are procedures in place for the unloading of vehicles to prevent fall from vehicles?

  • Are traffic management arrangement sutable?

Waste Management

  • Are waste transfer notes available and correctly filled in and filed on site?

Welfare Facilities

  • Ensure a facility is provided to change, dry and store clothing.

  • Mess facilities should include a place where workers can sit, make hot drinks and prepare food.

  • Mess facilities shall be of sufficient size for the number of employees on site and are provided with heating.

  • Ensure a supply of wholesome drinking water and cups are provided.

  • Ensure there are washbasins, hot and cold running water, soap and towels.<br>

Other

Summary

Audit Risk Level

  • Risk rating for this Audit.

Corrective Actions

Sign off

  • I confirm I have had the contents of this audit report explained to me.

  • Project Manager

  • Person conducting this Audit.

  • Audit concluded at:

Closure

  • All actions on this report have been completed on:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.