GENERAL REQUIREMENTS
-
Is there an amended copy of the OHS Act G.A.R.4 / C.R.
-
Is the Act available to all employees (G.A.R.4) + Proof Of Communication
-
Notification of Construction Work - Copy available and proof of submission in site CR4
-
Is a Mandatory Agreement in place OHSA Section 37(2) - (If Not Abandon Audit and Prohibit Work)
-
Number of employees exceed 20 on site (Is a committee established G.A.R.5)
-
Is the Construction Work Permit Number Visibly displayed at the site entrance (if applicable - CR3(4))
APPOINTMENTS
-
Delegated overall authority in matters pertaining the Act - 16(2)
-
Health & Safety Representative - Section 17(1) (more than 20 employees)(Certified Proof of Competency)
-
Health & Safety committee nominated chairman - OHSA Section 19(3)
-
Incident/Accident Investigator G.A.R.9(2) + (certified Proof of Competency)
-
Appointment as Principal Contractor C.R. 5(1)k - (If not abandon audit and prohibit work)
-
Appointment of contractor by Principal Contractor C.R.7(1)(v)(c)
-
Construction Manager C.R.8(1) + Registered with the SACPCMP as per the Act 48 of 2000 (Proof)
-
Assistant Construction Manager C.R.8(2) (Where Applicable) (Detailed CV to be available)
-
Construction Safety Officer C.R8(5) (Where Applicable) (Certified proof of competency)
-
CHSO Registered with SACPCMP C.R.8(6) (Proof)
-
Construction Supervisor C.R.8(7) appointed by C.R.8(1) (Certified proof of competency)
-
Subordinate Construction Supervisor C.R.8(8) appointed by 16.2 (Certified proof of competency)
-
Construction Site Risk Assessor C.R.9(1) (Certified proof of competency)
-
"Designation" , Fall Protection Developer C.R.10(1)(a) (Certified proof of competency)
-
Temporary Works Designer and Supervisor C.R.12(1) & C.R.12(2) (Certified proof of competency)
-
Excavation Supervisor and Inspector C.R.13(1) (Detailed CV available)
-
Demolition work Supervisor C.R.14(1) (Detailed CV available)
-
PR Engineer appointed to conduct structural survey C.R. 14(2)
-
PR Engineer Appointed to draft Demolition Mythology C.R.14(2)
-
Scaffold supervisor (for all scaffolding work operations) C.R.16(1) (Certified)
-
Suspended platform supervisor C.R.17(1) (Proof of training)
-
Rope Access Supervisor C.R.18(1)(a) (Proof of competency)
-
Material Hoist Inspector C.R.19(8)(a) (Proof of training)
-
Bulk Mixing Plant Supervisor C.R.20(1) Proof of competency)
-
Explosive Actuated Fastening Device inspector C.R.21(2)(b) (Proof of Training)
-
Explosive Actuated Fastening Device accessories issuer C.R.21(2)(b) (Proof of training)
-
Construction vehicle and mobile plant inspector C.R.23(1)(k) (proof of competency)
-
Construction vehicle and mobile plant operator (proof of competency & Medical)
-
Temporary Electrical Installation Controller C.R.24(e) (Proof of competency)
-
Stacking & Storage Supervisor C.R.28(a)
-
Fire Equipment Inspector C.R.29(h) (Proof of competency)
-
Supervisor of Machinery / The registered person G.M.R.2(2) (Proof of competency)
-
Emergency Evacuation Co-ordinator (Proof of training)
-
Fire Marshall (Proof of training)
-
Hazardous Chemical Substance Supervisor (Proof of competency)
-
Safety Harness Inspector (Proof of competency)
-
Scaffold Erector C.R.16 & SANS 10085/1 (Proof of competency)
-
Scaffold Inspector C.R.16 & sans 10085/1 (Proof of competency)
-
Piling Rig Operator (Proof of competency)
REGISTERS & CHECKLISTS
-
Minor Injury Dressing Register available (first aid cases)
-
First Aid Equipment Checklist available and up to date G.S.R.3(3)(a) (Min Contents)
-
Portable Ladders Checklist available and up to date for all ladders
-
Safety Harness Checklist available and up to date for all Safety Harnesses
-
Scaffold Checklist available and up to date for all scaffolds built C.R.16 & SANS 180085/1
-
Scaff-Tag visible on each Scaffold and weekly inspections in order, and signed off on Scaff-Tag C.R.16 & SANS 10085/1
-
Excavation Checklist available for all excavations and up to date.
-
Explosive Actuated Fastening Device Register Available
-
Explosive Actuated Fastening Device Checklist available and up to date
-
Explosive Actuated Fastening Device Cartridge issue and return register available and up to date
-
Are all daily Pre-Shift Inspections for motorized equipment done and signed off by the Operator/Mechanic and are all findings recorded
-
Fire Prevention Equipment Checklist available and up to date
-
Gas Cutting/Welding Checklist available and up to date
-
Lifting Machinery Checklist available and up to date
-
Lifting machinery certificates available D.M.R.18 (Load Test Certificates/Crane Calibration Certificates)
-
Lifting machinery logbook available and up to date
-
Lifting Tackle Load Test certificates available and up to date D.M.R.18 (Rope/Slings/Chains)
-
Lifting Tackle Checklist available and up to date
-
Portable Electrical Equipment Checklist available and up to date E.M.R.10 / C.R.24(e) (including extensions)
-
All earth leakage tested monthly and Checklist available and up to date (SABS 0142-1)
-
All power sources protected by a earth leakage (SABS 0142-1)
-
Pneumatic Tool Register available and up to date
-
Pressure Equipment Register available and up to date
-
Is there an up to date record kept of P.P.E. issue and signed by employees.
-
Hand Tool Checklist available and up to date
-
PPE issued as identified on the Risk Assessments
Health & Safety Organisation
-
Health & Safety Plan approved by client C.R.7(2)(a)
-
Copy of Principal Contractor and Contractors health & Safety Plan available C.R. 7(1)
-
Client's Health & Safety Specification provided C.R. 7(1)(c)(i) (Proof thereof)
-
Organogram available (Organogram must be in accordance to Appointments)
-
Does the Principal Contractor audit the contractors at least once a month C.R. 7(1)(vii)
-
Health & Safety Representative monthly report available
-
Are the Representatives nominated and elected by the workers (proof must be provided)
-
Is the ratio of HSE Representatives correct (1 representative for 19-50, and an additional representative for every 50)
-
Health & Safety Committee established? OHSA Section 19(1)
-
Internal Health & Safety committee meeting held/minutes available and signed by 16.2 appointee. Are records kept for 3 years G.A.R.5
-
Evaluating the employees physical and psychological fitness necessary to operate Construction Vehicles, Mobile plant (C.R.21) and records thereof (validity period determined by Health Practitioner)
-
Fall Protection Plan Implemented C.R. 10(1)(b)
-
Fall Protection Plan maintained C.R. 10(1)(b)
-
Disciplinary action taken to ensure adherence to Fall Protection Plan C.R.10(1)(c)
-
Evaluating the employees physical and psychological fitness necessary to work C.R.10(2)(b), C.R. 7(1)(g) and records thereof (validity period determined by the Health Practitioner)
-
Program of training employees working from elevated positions and records thereof C.R.10(2)(c) (accredited training)
-
Are all 8(1) appointees in possession of the latest updated version of the Fall Protection Plan C.R. 10(3)
-
Rescue Plan in place and employees trained on the plan and competent to conduct rescues
-
All openings in floors, edges, slabs, hatchways and stairways adequately guarded, fenced or barricaded or similar means are used to safeguard any person from falling through C.R.10(4)(a)
-
Are all fall protection equipment suitable and of sufficient strength C.R.10(4)(d)(i)
-
Additional requirements need to be indicated in the Fall Protection Plan where roof work is being performed on a construction site C.R.10(5)
-
Roof work is properly planned C.R.10(5)(a)
-
Roof Erectors are competent C.R.(5)(b) (Proof of Competency)
-
No Employees permitted to work on roofs during inclement weather or weather conditions that holds hazard to employee's health & safety C.R.10(5)(c)
-
Roof work C.R. 10(5)(d-g) - Prominent warning notices are in placed at all covers to openings that cannot sustain applicable weight.
-
Areas mentioned in (d) barricaded to prevent person from entering
-
Suitable and sufficient platforms, coverings are provided to be used in such a manner that the weight of the person passing across or working on or from fragile material is supported
-
Sufficient guard rails or barriers and toe boards to prevent the fall of any person, material, or equipment
-
Alphabetical Hazardous Chemical Substance List available and up to date
-
Material Safety Data Sheet available (MSDS)
-
Planned Job Observation available
-
Daily DSTI's completed by Supervisor/Construction Manager and communicated to workers
-
Toolbox Talks Topics Available and Training Attendance Registers
-
Letter of Good Standing is valid and reflects the correct nature of work
-
Annexure 1, W.C.L. 1, and W.C.L. 2 Forms Available G.A.R. 9
-
All incidents investigated
-
Sheltered eating area available for employees
-
Showers available - at least one for every 15 employees
-
Sanitary Facilities - at least 1 for every 30 employees
-
Changing facilities for each gender
-
Is there a written lock-out procedure available (electrical)
-
Safety File available with all documentation required in terms of provisions of the OHS Act and C.R.7(1)(b)
-
Emergency Evacuation Plan available and communicated to all employees
-
Continuous Training Matrix available detailing H&S Training delivered to all employees
-
Contractor's Scope of Work to be defined and available in the Safety File
-
Lockout procedure available (mechanical)
-
Intoxication Policy - Does the employer have a procedure in place preventing any person who appears to be under the influence of alcohol or drugs to enter or remain on his premises G.S.R. 2(a)
-
Lighting in the building (eating areas, work areas) adequate E.R.3
-
Facilities (toilets, urinals, and showers) kept clean and hygienic condition / checks done / actioned and kept on record
-
Hand wash facilities provided at toilets and eating areas
-
Are conditions in place under which a person may enter your workplace G.S.R.2(c)
-
Hearing protection used in areas where noise level exceeds 85 dB
-
All employees trained in the use of the available fire extinguishers (proof of training)
-
Are first aid boxes allocated to qualified First Aiders
-
Is the first aid ratio correct (1 for 10-50 then 1 additional for every 50 employees)
-
Is there an eyewash fountain / eyewash kit, should the need exist G.S.R. 3(8)
-
Are all employees trained in the use of the eyewash fountain / eyewash kit should the need exist (G.S.R.3(8)
-
Records kept of all minor injuries (first aid cases) on a dressing register
-
Are all injuries investigated and recorded on annexure 1 / W.CL. Forms
-
Are all injuries reported to the relevant person(s); eg. Supervisor, Safety Officer etc.
-
Are all method statements available (Detailed method of work)
-
Contractor's Project Baseline HIRA available and approved
-
Are all applicable Risk Assessments available C.R.9
-
Are all Risk Assessments communicated to employees involved in performing the tasks (proof of communication)
-
Are all written safe work procedures available
-
All employees inducted C.R.7(6) (proof of Induction and ID copies available)
-
All cranes fitted with a Load Limiter D.M.R. 18(9)
-
Provision made for site visitor's inductions
-
Is there a risk assessment monitor & review plan available
Field Execution
-
Are all elevated height work performed from a position as if working from a ladder or scaffold C.R.10(4)(b)
-
Are notices placed in conspicuous places at openings through which a person could fall C.R. 10(4)c
-
Is business conducted in such a manner that you do not expose another person to the hazards associated with your activities OHSA Section 9
-
All grinder machines clearly marked with the rated speed D.M.R. 8
-
Are all lifting machinery clearly marked with the maximum mass load D.M.R. 18
-
Are all Mobile Plant equipped with an automatic acoustic reversing alarm C.R. 23(j)
-
Are all gas cylinders secured in a vertical position
-
Are all operators of gas cutting & welding issued with appropriate PPE/PPC G.S.R. 9
-
Are all operators of welding and gas cutting equipment trained in the safe use thereof? G.S.R. 9
-
Are flashback arrestors fitted on both the bottles and the torch
-
Storage facilities for chemicals adequate
-
All Explosive Actuated Fastening Device operators provided with correct and adequate PPE / PPC D.M.R. 21(a)
-
All Explosive Actuated Fastening Device operators making use of PPE / PPC D.M.R. 21(a)
-
Cartridges for explosive devices accurately stored
-
Emergency telephone numbers displayed
-
First Aider in charge of box indicated by signage G.S.R> 3(6)
-
First Aid Box location indicated by signage G.S.R. 3(6)
-
Are all electrical Contractors registered with the Department Of Labour E.I.R. 6
-
Emergency assembly points indicated by signage
-
Emergency Evacuation Plan communicated to all employees
-
Emergency Evacuation Plan indicate key personnel contact details
Contractor / Employer Responsibility
-
Ensure that all ladders comply with G.S.R. 13 (a)
-
Ensure that all precautionary methods are in place in excavations as per G.S.R. 5(1) and in compliance with C.R. 13(2)(j)
-
Are warning signs positioned next to excavations as per C.R. 13(2)
-
Proof of permission given in writing to commence excavation C.R.13(2)(ii)(a)
-
Inspections of excavations and registers C.R. 13(2)(h)(i)(ii)(iv)(v)
-
Letter of authority and certification to operate construction vehicles and mobile plant C.R. 23(1)(d)(1)
-
Lifting Machinery Inspector D.M.R. 18(5)
-
Lifting Tackle Inspector D.M.R. 18(5)
-
Lifting Machinery Operator D.M.R. 18(11)
-
Accredited person - master / installation electrician E.I.R. 11
-
Portable Electrical Equipment Inspector E.M.R. 10(4)
COVID-19
-
-
Risk Assessment taking COVID-19 into account and workplace circumstances
-
Proof of communication of Risk Assessment
-
Procedure of managing the Risk Assessment and how it will be implemented (SOP/SWP)
-
Inform employees that if they have the associated symptoms for COVID-19, they must not come to work and take paid leave as per Section 22 of the BCEA
-
Do contractors conduct regular Toolbox Talks regarding COVID-19
-
Does the Contractor do screening tests on all employees and record the results daily
-
Does the contractor have a medical surveillance plan
-
Does the contractor have hand sanitiser available with at least a 70% alcohol volume
-
Does the contractor have additional hand wash facilities with soap and disposable hand towels Does the contractor do regular disinfection of work places and facilities and keep track on a checklist
-
Do all employees wear suitable face masks
-
Each employee to be issued with a minimum of 2 cloth masks as per Government requirements
-
All employees to be trained in the use of these cloth masks and safe keeping
-
Do the contractors have washing and drying facilities for these cloth masks
-
Does the contractor have a Compliance Officer Appointed