Title Page

  • Contractors

  • Project name and number

  • Conducted on.

  • For any open discrepancies during this report please respond in writing (memorandum or e-mail) within 48hrs of corrective action taken if addressed, or plan of action (with ILSMs in place) to mitigate risk of discrepancy if not yet corrected

Type of Inspection

  • What type of inspection was conducted?

undefined

  • For any open discrepancies during this report please respond in writing (memorandum or e-mail) within 24hrs of corrective action taken if addressed, or plan of action (with ILSMs in place) to mitigate risk of discrepancy if not yet corrected.

Attendance

  • What type of inspections rounds is being conducted?

  • Thomas Dentice

  • Russell Schneider

  • Paul Buchmann

  • Chloe Fisher

  • Dan McRae

  • Amy Gersonde

  • Mary Whitehouse

  • Jessica Kois

  • Jon Wardecke

  • FM

  • Enter Name(s)

  • Other

  • Enter Name(s)

  • Thomas Dentice

  • Other

  • Type Name(s)

1.0 General

  • 1.1 SSHO and Subcontractor CPs Onsite

  • 1.2 Accident Prevention Plan/Activity Hazard Analyses

  • 1.3 Training

  • 1.4 Orientation/ code of safe practices

  • 1.5 Toolbox meetings/pre-job safety

  • 1.6 Postings (OSHA) (project info/ POC)

  • 1.7 Emergency numbers/ first aid/ eye wash

  • 1.8 Toilets/hand wash/drinking water

  • Additional Comments

2.0 Site Security

  • 2.1 Badges/Guards/Contractor POVs/Conduct

  • 2.2 Entrance/Exit/Fencing

  • 2.3 Secured to prevent patient/public entry

  • Additional Comments

3.0 Personal Protective Equipment

  • 3.1 Hard Hat, Eye & Face Protection

  • 3.2 Hearing Protection, Footwear

  • Additional Comments

4.0 Environment/PCRA/ILSM

  • 4.1 Traffic/ public safety

  • 4.2 Illumination

  • 4.3 ICRA completed & posted as necessary

  • 4.4 ILSM implemented as necessary, ILSM Correct dates and contractor following listed procedures (i.e. rerouted exits and corridor pathway clear)

  • 4.5 Ventilation, incl. negative air/ HEPA filtration

  • 4.6 Integrity of dust control and containment

  • 4.7 Housekeeping

  • 4.8 1 hr. fire separation from Patient Care areas

  • 4.9 Emergency exits clear / unlocked

  • Additional Comments

5.0 Fire Protection

  • 5.1 Fire extinguishers checked/ accessible

  • 5.2 Alarm/ detection system

  • 5.3 Flammable/ combustible material ( Safely stored )

  • Additional Comments

6.0 Electrical Safety

  • 6.1 Electrical Safe Work Condition/De-energized

  • 6.2 LOTO Process - AHA/Procedure Developed

  • 6.3 LOTO Process - Haz/class PPE Used

  • 6.4 LOTO Process - Lock/Tag/Tested

  • 6.5 Ground Fault Protection (GFCIs)

  • 6.6 Path to Ground continuous

  • 6.7 Installation & Use/Strain Relief/Insulation

  • Additional Comments

7.0 Welding & Cutting

  • 7.1 Approved/current hot work permit

  • 7.2 Cylinders - Proper use & segregation

  • Additional Comments

8.0 Ladders

  • 8.1 Ladder without damage/ good condition

  • 8.2 3' above landing/ Tied and Braced

  • 8.3 Proper Use/Top Step

  • Additional Comments

9.0 Fall Protection

  • 9.1 Use of Fall Protection over 6'

  • Additional Comments

10.0 Hand/Power Tools

  • 10.1 Guards attached/ functional

  • Additional Comments

11.0 Scaffolds/Shoring (Interior/Exterior)

  • Does this site have scaffolds or shoring (interior or exterior)?

  • 11.1 Current Certified Installation Doc

  • 11.2 Planks/Toe Boards

  • 11.3 Railed Properly

  • 11.4 Falling object protection

  • Additional Comments

12.0 Zoom Booms/Lift Trucks

  • Does this site have scissors/zoom boom or lift trucks?

  • 12.1 Aerial Lift-Harness & Lanyards (JLG)

  • 12.2 Operator Certification

  • Additional Comments

13.0 Excavations/Trenches

  • Does this site have excavations or trenching?

  • 13.1 AHA/Permit

  • 13.2 Underground line located/ potholed

  • 13.3 Spoil piles at least 2' from edge, properly shored/ sloped or benched

  • 13.4 Barricades/ protective measures

  • undefined

14.0 Concrete Operations

  • Does this site have concrete operations?

  • 14.1 Rebars capped

  • 14.2 Cement/ silica dust exposures

  • 14.3 Cutting sawing/ grinding controls

  • 14.4 PPE utilized by crew

  • 14.5 Wall or structure supported

  • Additional Comments

15.0 Cranes

  • Does this site have a crane?

  • 15.1 Inspections & maintenance

  • 15.2 Critical Lift Plan/AHA completed

  • 15.3 Safe Lift/over buildings

  • 15.4 Crane set up & swing protection

  • 15.5 Certified operator

  • Additional Comments

16.0 Hazard Communication

  • 16.1 SDSs - all chemicals & available

  • 16.2 Hazard Warning - Labeling

  • Additional Comments

17.0 Occupational Health Hazards (Lead & Asbestos)

  • Does this site have lead & asbestos?

  • 17.1 Lead–Exposure Assessment

  • 17.2 Asbestos-Exposure Assessment

  • 17.3 Asbestos-Respiratory Protection

  • Additional Comments

18.0 Environmental Considerations

  • 18.1 Is construction waste being recycled?

  • Additional Comments

  • Is construction taking place outside (potential to cause erosion)?

  • 18.3 Are good housekeeping practices in place to prevent discharges of debris to waterways?

  • 18.4 Are erosion control best management practices installed and functional?

  • 18.5 Is public right of way curb line free from tracked soil and accumulation?

  • Additional Comments

20.0 Other Hazards

  • Is site free of any other noted hazards?

  • Add media

  • undefined

Recommendations/Best Practices

  • undefined

  • Add media

Progress Pictures

  • Progress Pictures

  • Picture
  • Add media

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.