Title Page
-
Contractors
-
Project name and number
-
Conducted on.
-
For any open discrepancies during this report please respond in writing (memorandum or e-mail) within 48hrs of corrective action taken if addressed, or plan of action (with ILSMs in place) to mitigate risk of discrepancy if not yet corrected
Type of Inspection
-
What type of inspection was conducted?
undefined
-
For any open discrepancies during this report please respond in writing (memorandum or e-mail) within 24hrs of corrective action taken if addressed, or plan of action (with ILSMs in place) to mitigate risk of discrepancy if not yet corrected.
Attendance
-
What type of inspections rounds is being conducted?
-
Thomas Dentice
-
Russell Schneider
-
Paul Buchmann
-
Chloe Fisher
-
Dan McRae
-
Amy Gersonde
-
Mary Whitehouse
-
Jessica Kois
-
Jon Wardecke
-
FM
-
Enter Name(s)
-
Other
-
Enter Name(s)
-
Thomas Dentice
-
Other
-
Type Name(s)
1.0 General
-
1.1 SSHO and Subcontractor CPs Onsite
-
1.2 Accident Prevention Plan/Activity Hazard Analyses
-
1.3 Training
-
1.4 Orientation/ code of safe practices
-
1.5 Toolbox meetings/pre-job safety
-
1.6 Postings (OSHA) (project info/ POC)
-
1.7 Emergency numbers/ first aid/ eye wash
-
1.8 Toilets/hand wash/drinking water
-
Additional Comments
2.0 Site Security
-
2.1 Badges/Guards/Contractor POVs/Conduct
-
2.2 Entrance/Exit/Fencing
-
2.3 Secured to prevent patient/public entry
-
Additional Comments
3.0 Personal Protective Equipment
-
3.1 Hard Hat, Eye & Face Protection
-
3.2 Hearing Protection, Footwear
-
Additional Comments
4.0 Environment/PCRA/ILSM
-
4.1 Traffic/ public safety
-
4.2 Illumination
-
4.3 ICRA completed & posted as necessary
-
4.4 ILSM implemented as necessary, ILSM Correct dates and contractor following listed procedures (i.e. rerouted exits and corridor pathway clear)
-
4.5 Ventilation, incl. negative air/ HEPA filtration
-
4.6 Integrity of dust control and containment
-
4.7 Housekeeping
-
4.8 1 hr. fire separation from Patient Care areas
-
4.9 Emergency exits clear / unlocked
-
Additional Comments
5.0 Fire Protection
-
5.1 Fire extinguishers checked/ accessible
-
5.2 Alarm/ detection system
-
5.3 Flammable/ combustible material ( Safely stored )
-
Additional Comments
6.0 Electrical Safety
-
6.1 Electrical Safe Work Condition/De-energized
-
6.2 LOTO Process - AHA/Procedure Developed
-
6.3 LOTO Process - Haz/class PPE Used
-
6.4 LOTO Process - Lock/Tag/Tested
-
6.5 Ground Fault Protection (GFCIs)
-
6.6 Path to Ground continuous
-
6.7 Installation & Use/Strain Relief/Insulation
-
Additional Comments
7.0 Welding & Cutting
-
7.1 Approved/current hot work permit
-
7.2 Cylinders - Proper use & segregation
-
Additional Comments
8.0 Ladders
-
8.1 Ladder without damage/ good condition
-
8.2 3' above landing/ Tied and Braced
-
8.3 Proper Use/Top Step
-
Additional Comments
9.0 Fall Protection
-
9.1 Use of Fall Protection over 6'
-
Additional Comments
10.0 Hand/Power Tools
-
10.1 Guards attached/ functional
-
Additional Comments
11.0 Scaffolds/Shoring (Interior/Exterior)
-
Does this site have scaffolds or shoring (interior or exterior)?
-
11.1 Current Certified Installation Doc
-
11.2 Planks/Toe Boards
-
11.3 Railed Properly
-
11.4 Falling object protection
-
Additional Comments
12.0 Zoom Booms/Lift Trucks
-
Does this site have scissors/zoom boom or lift trucks?
-
12.1 Aerial Lift-Harness & Lanyards (JLG)
-
12.2 Operator Certification
-
Additional Comments
13.0 Excavations/Trenches
-
Does this site have excavations or trenching?
-
13.1 AHA/Permit
-
13.2 Underground line located/ potholed
-
13.3 Spoil piles at least 2' from edge, properly shored/ sloped or benched
-
13.4 Barricades/ protective measures
-
undefined
14.0 Concrete Operations
-
Does this site have concrete operations?
-
14.1 Rebars capped
-
14.2 Cement/ silica dust exposures
-
14.3 Cutting sawing/ grinding controls
-
14.4 PPE utilized by crew
-
14.5 Wall or structure supported
-
Additional Comments
15.0 Cranes
-
Does this site have a crane?
-
15.1 Inspections & maintenance
-
15.2 Critical Lift Plan/AHA completed
-
15.3 Safe Lift/over buildings
-
15.4 Crane set up & swing protection
-
15.5 Certified operator
-
Additional Comments
16.0 Hazard Communication
-
16.1 SDSs - all chemicals & available
-
16.2 Hazard Warning - Labeling
-
Additional Comments
17.0 Occupational Health Hazards (Lead & Asbestos)
-
Does this site have lead & asbestos?
-
17.1 Lead–Exposure Assessment
-
17.2 Asbestos-Exposure Assessment
-
17.3 Asbestos-Respiratory Protection
-
Additional Comments
18.0 Environmental Considerations
-
18.1 Is construction waste being recycled?
-
Additional Comments
-
Is construction taking place outside (potential to cause erosion)?
-
18.3 Are good housekeeping practices in place to prevent discharges of debris to waterways?
-
18.4 Are erosion control best management practices installed and functional?
-
18.5 Is public right of way curb line free from tracked soil and accumulation?
-
Additional Comments
20.0 Other Hazards
-
Is site free of any other noted hazards?
-
Add media
-
undefined
Recommendations/Best Practices
-
undefined
-
Add media
Progress Pictures
-
Progress Pictures
Picture
-
Add media
-
Comments