Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Previous Audit Report

  • Has the previous audit report been closed out?

  • Have all previous weekly issues been cleared?

Mainstream internal communications records system up and running?

  • Safety incidents, construction progress, key performance indicators, resources, labour hours etc recorded?

Management Controls

  • Is the site entrance secure?

  • Is the site fencing secure?

  • Have site notice boards condition

  • Have appropriate signs/notices been erected around the site i.e. mandatory use of PPE, Incomplete Scaffolds, No Smoking, Traffic Management, Fire assembly, Fist Aid Points etc.

  • Are Skill Cards available for inspection?

  • Accident Book review

  • Quality of supervision. Basis for view if unsatisfactory

  • Ensure site safety rules are displayed in a prominent position e.g. reception, canteen, site office etc.

  • Ensure all subcontractors have been assessed and are adequately resourced and competent for the work they are undertaking.

  • Training records for flag men, operator competency and basic fire fighting?

Access and Egress

  • Is there safe access and egress to all working areas of the site?

  • Have pedestrian walkways been provided to protect them from moving vehicles?

  • Are walkways free from obstructions and stored materials?

  • Are roads marked? Are pedestrian walkways marked?

  • Access and Egress compliant?

  • Are records kept of all personnel working on the activities per section 6 method statement on access road construction?

Compressed Gasses (e.g. LPG, Acetylene)

  • Are they kept away from flammable liquids?

  • Are the properly stored in a purpose made cage?

  • Are gasses segregated by type?

  • Is the cylinder valves fully closed when not in use?

Consultation

  • Are minutes and actions from meeting available and published on site?

  • Are any actions being implemented ?

  • Ensure appropriate Tool Box Talks are given to all employees and that the Tool Box Talks are appropriate and relevant to the work being undertaken.

  • Ensure that an attendance register has been maintained and signed by all persons present at each Tool Box Talk.

  • Consultation compliant?

Control of Substances Hazardous to Health (COSHH)

  • Are material safety data sheets available to assist with COSHH assessments.

  • Have the hazards associated with the use of such materials been properly communicated to those affected.

  • Ensure all dangerous/hazardous materials/Substances are clearly marked/identified and stored in a secure location appropriate to the substance.

  • Have the appropriate control systems and PPE been provided and is the PPE being used.

  • COSHH Compliant?

Demolition Operations

  • Has a competent person been appointed to oversee the demolition operations?

  • Is the area barried off and suitably signs in place.?

  • Is there adequate dust suppression where required?

  • Is there sutable noise controls in place?

  • Is there suitable lighting?

  • Is material being removed from site on a regular basis and not allowed to accumulate?

  • Are all demolition operatives adiquitly trained, supervised and instructed?

  • Demolition Operations compliant?

Electrical Equipment

  • Ensure that existing services e.g.: electricity cables, gas mains etc have been identified and effective steps have been taken to prevent danger from them.

  • Check that low voltage tools and equipment are being used wherever possible.

  • Check that cables and leads are protected from damage.

  • Check all connections are properly made and suitable plugs are used.

  • Ensure that cables and trailing leads are not trip hazards.

  • Electrical Equipment compliant?

  • Check that only 110v CTE hand tool etc are in use.

Environmental Management

  • Site wide issues

  • Has the environmental control officer inspected all proposed road routes and given appropriate approval for use of the route or given instructions to be followed?

  • Have excavation permits been obtained and signed off by the engineer?

  • Environmental Emergency

  • Have all potential pathways been identified and addressed?

  • Are any noise/dust issues present and are they being suitably controlled?

  • Are weekly environmental checks taking place?

Excavations/Earthworks

  • All excavations should be carried out in accordance with a detailed method statement s and permit to dig. Is there a permit to dig?

  • Check that there is adequate support and propping for the excavation, or whether it has been sloped or battered back to a safe angle.

  • Check that there is a safe method used for placing supports, without the need for operatives to work in an unsupported trench.

  • Check that there is safe access into the excavation (i.e.: a sufficiently long and secured ladder).

  • Check that barriers or other protection to stop people/vehicles falling in are in place.

  • Ensure that materials, spoil and plant is stored away from the edge of the excavation to reduce the chance of collapse.

  • Ensure that the excavation is regularly inspected by a competent person and that a record of such inspections is maintained.

  • Excavations/Earthwork compliant?

  • Does the excavation affect the stability of neighbouring structures or services.

Fire Risks and Management

  • Ensure all staff know what these procedures are and that they form part of the site induction.

  • Ensure that there are adequate escape routes and that these are kept clear of obstructions.

  • Ensure that the quantity of flammable materials, liquids and gases are kept to a minimum and are adequately stored.

  • Fire Risk and Management compliant?

First Aid

  • An appropriate number of trained and qualified first aiders should be available on the site.

  • Check the number of first aiders required, this is dependent on the type of work or operations, the number of workers on site and any special or unusual hazards.

  • Are the names of all first aiders detailed on the site notice board?

  • First Aid requirements compliant?

Housekeeping

  • Ensure Debris is not be allowed to collect around the site.

  • Ensure staff adopt the philosophy of 'A tidy site is a safe site'.

  • Ensure all waste receptacles are are appropriately signed for their intended contents.

  • Housekeeping compliant?

Induction

  • Ensure all staff receive a site specific safety induction before starting work.

  • Are all visitors including the client representatives being inducted?

  • Are site safety inductions being adequately carried out both for staff and visitors?

  • Are site safety induction records being maintained on site?

Lifting Operations/Equipment

  • Ensure a (competent) Appointed Person co-ordinates all lifting operations.

  • Have all lifting operation got a valid lifting plan?

  • Ensure that all lifting equipment has been tested and installed by a competent person and is regularly maintained and inspected.

  • Check that the operators are trained and competent.

  • Ground condition suitability<br>

  • Check that the rated capacity/safe working load is clearly marked.

  • Ensure that the lifting equipment is capable of lifting the heaviest component within the anticipated working radius - allow for sufficient spare capacity.

  • Ensure that cranes and other lifting equipment has sufficient space to operate safely.

  • Ensure lifting operations do not take place near overhead power lines and excavations.

  • Lifting Operations/Equipment compliant?

  • Availability of documentation for all equipment

Manual Handling

  • Ensure that a manual handling risk assessment has been completed wherever regular lifting of heavy loads is required.

  • Check the suitability of using wheelbarrows, hoists, telehandlers and other plant or machinery so that manual handling of heavy objects is kept to a minimum.

  • Avoid the repetitive laying of heavy building blocks weighing more than 20KG.

  • Ensure all staff have received manual training.

  • Manual Handling compliant?

Mobile Scaffold Towers

  • Check that proprietary tower scaffolds have been erected and are being used in accordance with the suppliers instructions.

  • Check that the wheels of any tower scaffold have been locked when in use and check that the platform is empty when being moved.

  • Are they tagged safe for use?

  • Mobile Towers compliant?

Permits to Work

  • Hot Works - Hot Works include welding, oxy-acetylene cutting, use of angle grinders/skill saws etc.

  • Ensure all Hot Works Permits have been checked and reviewed and are valid for the work conditions.

  • Ensure suitable and sufficient fire prevention measures are in place, including the removal of all combustible materials, the use of fire blankets and fire extinguishers.

  • Ensure old permits have been cancelled and closed.

  • Dig - digging includes, excavations, knocking in pins, breaking ground etc.

  • Ensure permits to dig have been prepared and issued where the excavations are complex, hazardous or impact on the work or operations of another.

  • All permits to dig should be checked and reviewed prior to issue to ensure the appropriate controls have been included.

  • Ensure all contractors are working in accordance with permits to dig.

  • Ensure the permit is valid.

  • Check old permits have been cancelled and closed.

  • Permits compliant?

Personal Protective Equipment (PPE)

  • PPE General Requirements - Ensure PPE compatibility issues have been considered and that one piece of PPE not restrict the effectiveness of another piece of PPE.

  • Ensure all staff and visitors are wearing Hi-Viz vests or jackets.

  • Foot Protection

  • Ensure that footwear is fitted with steel toecaps and steel sole plates.

  • Ensure gloves are correct for their application and the activity being undertaken.

  • Eye protection available and used as applicable

  • Hearing Protection

  • Respiratory Protection (RPE) - Avoid the use of nuisance dust masks.

  • Safety Helmets

  • Ensure all staff and visitors are wearing safety helmets.

  • PPE requirements compliant?

Plant & Equipment

  • Ensure that tools and equipments are stored correctly to avoid damage to the equipment and persons.

  • Dry, covered and secure storage areas should be provided for all tools and equipment.

  • Check that all dangerous parts are guarded e.g. gears, chain, drives, projecting engine shafts etc.

  • Are mobile phones prohibited when operating machinery?

  • Check that guards are secure and in good repair.

  • Ensure all Plant and Machinery is inspected on a weekly basis by a competent person and recorded in a Plant Inspection Register.

  • Warning devices operational? E.g. Reversing horns?

  • Are all plant operators trained and hold a valid plant operators card for the categories being operated?

  • Plant and Equipment compliant?

  • Vehicles safely loaded?

Registers and Records

  • Check the site Inspection Registers for items such as scaffolding, excavations, coffer dams, plant and other equipment have been completed in a timely fashion.

  • Registers and Records compliant?

Risk Assessments and Method Statements

  • Ensure all Method Statements have been prepared by a competent person and have been checked, reviewed and signed.

  • Are method statements adequate and suitable for the task?

  • Does the method statement offer the necessary controls and required level of protection?

  • Ensure all contractors are working in accordance with the method statement.

  • Risk Assessments and Method Statements compliant?

Road Works

  • Road Works

  • Is there a site specific risk assessment in place for road works?

  • Are provisions in place to check signs etc at regular intervals?

  • Are roads and pedestrian footpaths clear of debris and mud?

  • Are advisory speed limits in place where required?

Scaffolding/Working platforms

  • Check that any scaffold erection, alteration or dismantling is carried out by a competent person.

  • Check that all standards are provided with base plates and timber sole boards which span at least two base plates.

  • Check that all standards, ledgers, braces and struts are in position.

  • Ensure that the scaffold is adequately tied to the building or structure to prevent collapse.

  • Check that double guard rails and toe boards or other suitable protection at every edge.

  • Check that there are additional brick guards provided to prevent materials falling from scaffold where they are used as a working platform.

  • Check that working platforms are fully boarded and that the boards are arranged to avoid tipping or tripping - i.e.: no overlapping boards.

  • Do all ladder accesses have self closing gates fitted?

  • Ensure that there are effective warning notices in place to stop any person using an incomplete scaffold.

  • Check that the scaffold is strong enough to carry the weight of materials stored on it and that they are evenly distributed.

  • Ensure that the scaffold has been properly maintained.

  • Ensure that a competent person inspects the scaffold regularly, at least once a week; and always after it has been altered, damaged and following extreme weather.

  • Are scaffold tags being utilised?

  • Ensure that these inspections are adequately recorded.

  • Are all scaffolds and working platforms sutable?

Security

  • Are the public fenced off or otherwise protected from the work?

  • Is out of hours security is place?

  • Is the perimeter fence secure and un-damaged?

  • Are all gated secured?

  • Are site security arrangements adiquate?

Site Set up

  • Are the following items displayed?

  • Latest H&S Policy?

  • Insurance Policy?

  • Fire Plan?

  • Emergency plan and contacts?

  • Signs for doors and cabins?

  • First aid location signs?

  • Assembly point signs?

  • Accident reporting process?

  • Site registration under the Hazardous Waste Regulations - does this apply?

  • No Smoking signs?

  • Is the site set up in accordance with CDM and Company requirements?

Storage of Substances, Chemicals and Oils.

  • Are Substances, Chemicals and Oils stored in the correct manner?

  • Are all bowsers locked?

  • Is there double bundled storage with at least 110%?

  • Are oil storage tanks at least 30m from any water course?

  • Were any/all drums stored off bare ground?

  • Is static plant fitted with drip trays?

  • Is plant and equipment in good order and free from leaks etc?

  • Storage of Substances, Chemicals And Oils compliant?

Traffic Management

  • Has a traffic management plan been prepared?

  • Are traffic management arrangement suitable and sufficient ?

  • Are pedestrians segregated from moving vehicles and plant?

  • Does the site layout match the plan?

  • Are storage areas identified?

  • Are loading areas identified?

  • Have one way or turning points been identified?

  • Are procedures in place for the unloading of vehicles to prevent fall from vehicles?

  • Are seat belts being used?

  • Are traffic management arrangement sutable?

Training and Skill Cards

  • Are all persons trained for their respective tasks?

  • Are Competency records available for inspection?

Waste Management

  • Is a waste management plan in place and sutable?

  • Ensure the plan is signed by all including the client/client representative?

  • Is the plan being maintained?

  • Is it being reviewed on a regular basis?

  • Is the hierarchy of waste control being applied on site - are operatives aware of the disposal process?

  • Are bins clearly labelled?

  • Are all waste carries and transfer stations records available?

  • Are waste transfare notes available and correctly filled in?

  • Is the process communicated via induction?

  • Waste management requirements compliant?

Welfare Facilities

  • Mess facilities should include a place where workers can sit, make hot drinks and prepare food.

  • Ensure access to the welfare facilities are accessible to all persons on the site.

  • Ensure that all drinking water supplies are appropriately signed.

  • Ensure sufficient toilets are readily available, maintained, kept clean & are properly lit.

  • Ensure there are washbasins, hot and cold running water, soap and towels.<br>

  • Ensure that the washbasins are large enough to wash up to the elbow and are kept clean.<br>

  • Where the nature of the work demands it, showers shall be provided.

  • Are showers provided?

  • Are welfare facilities cleaned on a daily basis?

  • Are welfare facilities compliant?

Working at Height

  • Check that access equipment is erected by competent persons and checked before use.

  • Ensure safe access and egress have been provided to areas.

  • Are work at height operation in accordance with the W@H Regulations?

Other

Summary

Audit Risk Level

  • Risk rating for this Audit.

Corrective Actions

Sign off

  • I confirm I have had the contents of this audit report explained to me.

  • Project Manager

  • Audit concluded at:

Closure

  • All actions on this report have been completed on:

  • Person conducting this Audit.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.