Title Page
-
Site conducted
-
Project/site details
-
Location
-
Post Code
-
What three Words:
-
Date and time of THIS inspection:
-
Inspected by
-
Signature
-
Weather status
Construction Site Inspection
1. Personnel on site
-
Site manager name
-
List Inspection Team Members:
2. Previous Inspection outstanding actions
-
Date and time of LAST inspection:
-
List of outstanding actions from LAST inspection
3. Main plant & work equipment in use on site
-
List main plant, equipment, tools observed being used during Inspection:
- Excavators, 5T, 10T, Tracked
- Telehandlers
- Dumper Trucks
- Piling Machines
- Buggies
- Tractors
- Quad Bikes
4. CDM & COVID-19 Management
-
Site Operational Procedures/RAMS during COVID-19 Pandemic, in line with PHE & CLCG
- Travel to Work / Driving at Work
- Site Access and Egress
- Hand Washing / Toilet Facilities / Rest Areas / Canteens
- Cleaning / Supplies / Frequency
- First Aid and Emergency Response
- Regular Training and Briefings
-
F10 posted and upto date
-
CPP adhered to/updated
-
Are all relevant registers upto date
-
Discuss shortfalls with Site Manager
-
Check all registers
-
Is H&S File being compiled
5. Permit to Work & High Risk SSOW
-
'Permit to Work' in place for high risk work
-
Does the work fall under the CDM 2015 Schedule 3 Work involving particular risks
- Work which puts workers at risk of burial under earth falls, engulfment in swampland or falling from a height, where the risk is particularly aggravated by the nature of the work or processes used or by the environment at the place of work or site
- Work which puts workers at risk from chemical or biological substances constituting a particular danger to the safety or health of workers or involving a legal requirement for health monitoring
- Work with ionizing radiation requiring the designation of controlled or supervised areas under regulation 16 of the ionizing Radiations Regulations 1999
- Work near high voltage power lines
- Control of lifting operations
- Dealing with services (water, electricity & gas, overhead powerlines, temporary electrical installations)
- Preventing Falls
- Work on excavations and work where there are poor ground conditions
- Work exposing workers to the risk of drowning
- Work on wells, underground earthworks and tunnels
- Work carried out by divers having a system of air supply
- Work carried out by workers in caissons with a compressed air atmosphere
- Work involving the use of explosives
- Work involving the assembly or dismantling of heavy prefabricated components
-
Have completed Permits to Work been correctly signed off
-
Detail any Permits to Work not correctly signed off
6. Risk Assessment & Method Statements (RAMS)
-
RAMS complete and approved for specific tasks/jobs
-
RAMS signed and complied with by all workers
7. COSHH Assessments
-
MSDS sheets available
-
COSHH Assessments for all substances
8. Health and Welfare (Schedule 2 of L153)
-
Toilets in place
-
Consumables all in place
-
Hand cleaner in place
-
Hand sanitiser in place
-
Hand towel/air dryer in place
-
Waste bins
-
Toilet paper in place
-
Rest Facilities
-
Is drinking water available
-
Are cups available
-
Is a method of heating food available
-
Is the temperature acceptable/heating in place
-
Are the rest areas suitiably ventilated and illuminated
-
Washing facilities available
-
Hot water available
-
Cold water available
-
Changing Facilities
-
Drying facilities
-
All facilities maintained & Clean
9. PPE
-
Mandatory PPE worn & in good repair
-
Correct PPE in relation to tasks/jobs
-
Is PPE being Observed?
-
Does the Site Manager hold spare PPE?
-
Storage facilities
-
Is there a conflict of PPE
10. Slip, Trip & Falls Hazards
-
Clear walkways/safe access routes for pedestrians
-
Are the trailing cables
-
Even/hazard free surfaces (fenced?)
-
Steps/stairs
-
Working areas
-
Are there hidden hazards on site?
-
Provide details of the hazard
-
Trenches/excavations protected
-
Provide details of unprotected trenches/excavations
11. Fire Safety
-
Are main fire routes clear
-
Are assembly points prominent and clear
-
Are fire routes clear of obstruction
-
Are suitable fire extinguishers/ fire points available
-
Fire extinguishers tested/inspected
-
Is a method of raising the alarm in place
-
Describe the method of raising the alarm
-
Is storage of combustibles/flammables managed correctly
-
Are smoking/vaping arrangements in place
-
Are 'No Smoking' signs promulgated
-
Is there evidence of smoking within buildings/structures
-
If yes, record evidence
-
Fire procedures communicated
-
Fire training/awareness/induction carried out
-
Hot works permit in place
-
Fire watch procedure with hot works
-
Provision of fire extinguisher with hot works
-
Have past hot works permits been correctly signed off
12. Health Surveillance
-
Monitoring required for noise/vibration/respiratory or dermatitis
13. Information, Instruction and Training
-
Health and Safety Poster available and correctly completed
-
Noticeboards with relevant information
-
Induction carried out for all site personnel/workers
-
Check induction sheets & initial last 5 inductees
-
Suitable training and instruction received for specific tasks/jobs
-
Check CSCS/CPCS/Tradecards on RAMS
-
Record of relevant toolbox talks
-
Check last Tool box talks carried out
-
Good practice observed for tasks/jobs
-
Where English is not the first language of personnel – is there appropriate information/instruction/training available
14. First Aid and Emergencies
-
First Aid facilities adequate
-
Ia an accident book/records available
-
How many accidents since last inspection
-
First Aid Boxes available & up to date
-
First Aiders/Appointed Persons
-
Emergency procedures
-
Where are formal Emergency Procedures located
-
Where are formal Emergency Contact numbers promulgated
-
Are the Emergency Contact numbers upto date
15. Site/Premises Housekeeping
-
Is general cleanliness and tidiness addressed
-
Are traffic routes clear and suitably segregated
-
Are materials stacked and stored correctly
-
Is the site secure with fencing
-
Appropriate safety signage for works
-
Record details
-
Are waste disposal arrangements in place
-
Detail areas to be addressed
-
Are there areas that require improvement
-
Advised improvemenets are:
16. Plant, Equipment and Tools
-
Pre start checklists available/complete
-
Is there safe storage for plant/equipment/tools
-
Operators correctly trained in use
-
Is plant observed being used correctly
-
Is there sufficient space for plant/equipment
-
Is all portable electrical equipment 110v
-
Is electrical equipment fit for use
-
Are electrical leads free from risk
-
Is relevant electrical equipment PAT tested
-
Are correct ladders / steps being used (EN131/Class 1)
-
Are portable towers being used (during Inspection)
-
Is a ScaffTag in place
-
Raise action with Site Manager
-
Is the operator erecting the tower PASMA trained
-
Raise as an action
-
Is fixed scaffolding being used (during Inspection)
-
Is a design and sign off certificate in place
-
Is a ScaffTag in place
-
Are cranes being used (during Inspection)
-
Is there a lifting plan/lifting RAMS in place
-
Raise as an action/concern
-
Has the Lifting log been checked
-
Raise as a concern
-
Is lifting equipment being used eg: chains, stropes, blocks n tackle (during Inspection)
-
Is details of the tackle/lifting equipmnent on the lifting register
-
Raise as a concern
-
Are operatives working at height (WAH) wearing harness
-
Record serial number & inspection date
-
Review RAMS to confirm use of harness or other WAH SSOW
17. Environmental
-
Waste correctly segregated/stored
-
Spill kits in place
-
Raise as a concern
-
Operators trained in use of spill kits
-
Evidence of spillages/ground contamination
-
Record evidence
-
Are waterways clear of all contamination
-
Record evidence
-
Are waste consignment notices available in the CPP
-
Raise as a concern
18. Others elements related to the site
-
Are noisy activities identified during inspection
-
Note details of worker #1 checked for ear protection
-
Note details of worker #2 checked for ear protection
-
Note details of worker #3 checked for ear protection
-
During Inspection were suitable Noise Risk Assessments carried out
-
Detail location #1 and reference of assessment
-
Detail location #2 and reference of assessment
-
Detail location #3 and reference of assessment
-
Are any other external activities interfering with site operations
19. Details of White/Yellow/ Red Card Issued
-
Were any WHITE cards issued since last inspection
-
Give details of WHITE card(s) issued
-
Were any YELLOW cards issued since last inspection
-
Give details of YELLOW card(s) issued
-
Were any RED cards issued since last inspection
-
Give details of RED card(s) issued
20. Details of further comments noted and photographs taken
-
General Comments