Title Page
-
Site conducted
-
Project Name
-
Conducted on
-
Project Number
-
Location
-
Supervisor Name
-
Leading Hand
-
SHEM / Workplace Plan
-
Is there a current SHEM on site?
-
Is there a Construction Workplace Plan on site?
-
Have relevant sections of the plan been completed and authorised?
-
Is the Project Diary being updated with significant information (e.g. incidents, risk assessment reviews, scope change)
-
Pedestrian Management
-
Are pedestrians walk ways delineated from work area?
-
Have pedestrians been provided a safe passage through/around the project?
-
Can a wheelchair user use the temporary path arrangement safely?
-
Is the pedestrian walk way clear and leaves no questions of where to go?
-
Is temporary path way surface of suitable material and free from slip, trip hazards
-
Is pedestrian lighting required for after hours?
-
Suitable after hours pedestrian access/pathway for safe passage around jobsite
-
Safe work method statements (CoGC)
-
Are SWMS on site for all high risk construction activities taking place? (Minor works SWMS/ SWMS specific to work scope)
-
Have all workers signed onto relevant SWMS?
-
Can workers demonstrate knowledge of SWMS content?
-
Is the project SWMS signed, reviewed 6 monthly or following change to scope of work?
-
Inductions
-
Has a site specific induction checklist been completed?
-
Have all workers on site undergone a site specific induction (and induction register updated)?
-
Check 3 workers for their induction cards (General Construction Induction, Construction Online Induction)
-
Pre-start site safety meeting
-
Are effective daily pre-start meetings being conducted? (relevant, workers engaged)
-
Are the daily pre-start forms authorised by Supervisor/LH and signed by all attendees?
-
Has pre-start been completed in full? (all sections)
-
Subcontractor management
-
Have subcontractors provided copies of their relevant SWMS (hard copy electronic version)
-
Have the SWMS been reviewed thoroughly against the checklist?
-
Are subcontractors safe work practices monitored regularly on site? (diary notes, SWMS compliance section in fortnightly inspection)
-
Is the subcontractor SWMS register current
-
Emergency procedures
-
Are emergency procedures and contact details displayed in site office?
-
Is Emergency Guideline/ERP on site and emergency team members been trained in the Emergency Guideline?
-
Has a site lay-out plan been developed (and displayed for projects >$250,000)
-
Has an emergency evacuation drill been conducted in the previous 6 months? (verify with Construction Admin.)
-
Traffic management
-
Is there a site specific Traffic Management Plan on site? (authorised by TMD, relevant to the scope of works, consider pedestrians and cyclists)
-
Has a current Temporary Road Closure Approval been obtained? (determined in the Workplace Plan) either Council and or Main Roads
-
Are site specific (or appropriate generic) Traffic Guidance Schemes on site? (authorised by TMD)
-
Has plant movement been considered? (Plant Internal Movement Plan)
-
Does the site specific Traffic Guidance Scheme reflect the actual traffic management layout?
-
Do Traffic Controllers have their current Traffic Controllers licence on their persons?
-
Are daily checklists/ risk assessments completed by Lead Traffic Controller prior to work commencing?
-
Are signs being checked through out the day across the site?
-
Mobile plant
-
Has a plant internal movement plan been developed? (e.g. for bulk earthwork projects etc.)
-
Can plant operator produce evidence of competency/ ticket / licence?
-
Have daily mobile plant pre-start checklist/ inspections been completed?
-
Have relevant workers signed the SWMS and understand the risks and controls? (this may include operators, spotters, doggers and others)
-
Are mobile plant risks managed in accordance with the relevant SWMS? (this may include operators, spotters, doggers and others)
-
Are overhead/underground services (electrical hazards) identified and managed in accordance with SWMS?
-
Has the risk of plant/ pedestrian (workers and public) interaction been managed in accordance with the hierarchy of controls?
-
Has the risk of plant/ plant interaction been managed in accordance with the hierarchy of controls?
-
Has the risk associated with plant operating in the vicinity of slopes and uncompacted earth (excluding excavations) been managed in accordance with the hierarchy of controls?
-
Excavations
-
Underground Services Location Checklist completed, DBYD, service location reports on site?
-
Have underground services been potholed? (each 4m when works are within 2.5m of the service [3m for gas])
-
Has an Excavation Start Card been completed? (kept with the operator)
-
Are spotters in place when excavating near underground services?
-
Are specific controls in place for collapse? (e.g. benching/ shoring/ sheet piling/ geotechnical engineering approval, zone of influence kept clear)
-
Is a physical exclusion zone in place around excavations to prevent risk of fall? (minimum 900mm high)
-
Is a safe access/ egress to the excavation provided? (ramp/ladder each 9m)
-
Can an emergency team member identify appropriate actions to take in the event of an excavation collapse?
-
Electrical
-
Plant operator and spotter know and maintain the overhead electrical exclusion zones?
-
Have overhead electrical exclusion zones been physically marked?
-
Are visual aids in place to identify electrical services?
-
Has all electrical equipment (portable tools, office equip, lunch room, RCD's etc.) been tested and tagged within the 3 month timeframe? (2 weeks grace period permitted)
-
Are all plugs, power points and leads in good condition, and located so as not to incur damage?
-
Is construction wiring labelled ("construction wiring") and certificate of test provided by electrician?
-
Risk of falls (>2m)
-
Is all edge protection compliant? (minimum height kick rail is 250mm, mid rail is 450mm and top rail is 900mm)
-
Are harnesses and fall arrest equipment in a serviceable condition?
-
Is fall protection equipment used by competent persons? (if using a harness, fall arrest, static line, workers must be trained in Working at Heights)
-
Has risk of falling objects been eliminated/ reduced?
-
Are ladders secured at top, bottom, or both so far as reasonably practicable?
-
Is a rescue plan in place and understood?
-
Is scaffolding being used on site?
-
Is scaffolding installed by a competent person?
-
For scaffold over 4m has a certification tag been issued?
-
Confined spaces (work in or near)
-
Enter name of Competent Person
-
Verify confined space training is current
-
Enter name of Standby Person
-
Verify confined space training is current
-
Enter name of Worker entering confined space
-
Verify confined space training is current
-
Add the names of any other confined space workers and verify training is current
-
Has signage and barricades been placed around work area?
-
Has a bump test of the gas monitor been conducted?
-
Has the Confined Space Entry Permit been completed correctly?
-
Has the emergency response been documented on the permit and discussed with the relevant workers?
-
Was the emergency response equipment inspected for damage or faults prior to use? (e.g. harnesses, ropes, gas cylinders, tripods, davits, rescue mat)
-
Were the gas levels checked and confirmed safe prior to entry? (including oxygen)
-
Is the worker connected to a tripod/ anchor point/ davit arm while in the confined space?
-
Is the portable breathing apparatus being used correctly? (purged and fit tested prior to use)
-
Was worker carefully removed from confined space?
-
Was the worker placed into the recovery position and emergency services called? (simulation only)
-
Risk of drowning
-
Has risk of drowning been identified in the SWMS for the task?
-
Are hazardous areas separated / isolated? (consider hierarchy of control)
-
Is edge protection compliant (900mm high, top and mid rails, toe rail or kick board, maximum 450mm between rails)
-
Are at least two workers or a spotter present?
-
Are changes in body or water conditions assessed?
-
Are mobile plant exclusion zones enforced (minimum 2m from edge or outside zone of influence?)
-
Is there an allocated spotter with UHF comms monitoring mobile plant operations?
-
Are emergency procedures in place relevant to the works?
-
Have emergency response procedures been rehearsed?
-
Is emergency response equipment readily accessible?
-
Is emergency response equipment fit for purpose?
-
Has an assembly area been identified and understood?
-
Is safe access / egress provided at the work place?
-
Hazardous chemicals
-
Is there an up to date register of hazardous chemicals on site? (cross reference a product on site against the SDS register)
-
Does the register show the maximum quantities on site?
-
Does the register show the SDS expiry date? (valid for 5 years from issue date)
-
Are SDS readily available to all workers?
-
Are hazardous chemicals stored on site segregated as per the segregation chart?
-
Does the crew truck have an updated SDS folder?
-
Are gas installations in caravans compliance plated?
-
-
First aid
-
Are there adequate and qualified first aiders on site? (1 per 25 persons)
-
Are the first aid kits fully stocked and contents in date?
-
Is there an adequate quantity of first aid kits for workers on site? (1 per 25 persons)
-
Are the kits regularly checked? (monthly)
-
Is the appropriate first aid signage in place? (including first aiders names, and contact details displayed)
-
If a defib on site, is there signage installed?
-
Personal protective equipment
-
Have PPE requirements for the site been identified (e.g. PRA, SWMS, PPE Matrix)?
-
Are adequate PPE supplies available to workers?
-
Are workers wearing the correct PPE, specific to their tasks?
-
Incident and hazard reporting
-
Have all workers aware of the incident reporting procedure and have understanding of a 'Notifiable Incident'?
-
Are all incidents documented in HandS (validate with WHS team) and an entry made in the Workplace Plan Project Diary?
-
Are incidents/ previous issues discussed and noted at the next days pre-start?
-
Are all workers aware how to identify and report WHS hazards?
-
Fortnightly site inspections
-
Are fortnightly site inspections being carried out? (for projects exceeding 2 weeks in duration or 2 week turn around on small projects)
-
Are inspections conducted thoroughly and checklists filled out correctly?
-
Are all corrective actions required being recorded?
-
Are corrective actions being carried out and noted on the checklist?
-
Site barricading and signage
-
Have all power poles/ power lines/ power boxes/ obstacles within work zone been identified (e.g. tiger tape from ground to 2m, banners)?
-
Have specific work area hazards been identified/ demarcated accordingly (excavations, confined spaces etc.)
-
Is Principal Contractor signage displayed prominently at construction projects (>$250,000)?
-
Are exclusion zone signs in place? (e.g. Construction Site - No Entry)
-
Are PPE signs in place?
-
Is panel fencing installed as per work instruction or suppliers spec (clamped and braced)?
-
Is barrier mesh/ delineation fit for purpose and secured properly with caps on all pickets/ reo bars?
-
Fire protection
-
Are there fire extinguishers and blankets on site? (task specific)
-
Has all fire equipment been tested and tagged within the last 6 months?
-
Are extinguishers held in place with a bracket or similar where necessary? (for portable buildings and vehicles)
-
Is the appropriate fire equipment signage in place?
-
Lifting and supporting gear
-
Has all lifting gear been tested and tagged within the required timeframe?
-
Are safe working loads marked on all lifting equipment and safety catches on all hooks?
-
Have ground conditions when craning been considered in relevant SWMS?
-
Is lifting gear stored correctly? (off the ground level)
-
Are relevant workers ticketed/ competent for all lifting activities?
-
Housekeeping and amenities (toilets and site vans)
-
Are good housekeeping practices evident in work zones and compound?
-
Is adequate drinking water available to workers (min. 2L per person per day)
-
Are lunch rooms, site offices and caravans clean?
-
Are there an adequate number toilets provided to workers? (1 per 15 workers)
-
Is there a regular cleaning system in place? (once a week minimum)
-
Are there adequate waste bins and regular rubbish removal?
-
Are the amenities provided suitable for workers?
-
Do amenities provide shaded areas?
-
Are tools, equipment and materials correctly stored?
-
Are correct tools and equipment being used appropriately?
-
Is potable water available on site for hand washing etc?
-
Fuel storage
-
Do fuel storage locations have appropriate ventilation and signage?
-
Has a safe area for fuel dispensing been designated? (no ignition sources)
-
Are fuel containers in good condition and fuel tag attached?
-
Are spill control materials on site?
-
Is a fire extinguisher located near fuel storage area?
-
Plant, equipment maintenance and isolation
-
Have all mobile plant pre-starts been filled out and kept on plant?
-
Are all workers aware of the correct procedure of what to do with faulty equipment?
-
Have lock-out switches been installed on all machinery?
-
Are "DO NOT START" and "OUT OF SERVICE" tags readily available on site?
-
Have workers been instructed in the need for and use of the Isolation Procedures?
-
Prescribed occupations
-
Is an up to date register of prescribed occupations kept on site?
-
Are all trainee plant operators, including subcontractors and labour hire workers, affiliated with a Registered Training Organisation (RTO) and operating to a training plan developed by the RTO?
-
Visitor control
-
Are visitors directed to report to the site office by all workers?
-
Have visitors signed the visitors register, as well as signed out when leaving site?
-
Do site workers brief visitors on the site health and safety rules?
-
Are visitors checked they are wearing the correct PPE?
-
Are visitors to the site accompanied by site workers at all times?
-
Does the Safety Noticeboard contain the following information
-
CoGC WHS Commitment Statement?
-
Emergency procedures and contacts?
-
"Who Represents You in WHS" poster?
-
WHS Issue Resolution Procedure?
-
Latest safety alerts and bulletins?
-
Latest tool box minutes?
-
Latest WHS Committee Meeting Minutes?
-
Site layout plan?
-
PPE Matrix?
-
Tag station?
-
Measuring and monitoring equipment
-
Has the equipment been calibrated within the relevant timeframes?
-
Are there adequate storage facilities?
-
Environmental
-
Is an Environmental Plan in place and updated regularly (Major Projects only)
-
Are environmental sediment control devices installed and properly maintained (minimum 70% capacity)
-
Are the latest environmental procedures, policies and emergency information on site?
-
Is there a focus on erosion control? (e.g. ground cover)
-
Are high risk erosion areas adequately protected? (e.g. mulching)
-
Are completed ares rehabilitated promptly? (e.g. turfing)
-
Are there adequate spill control materials on site?
-
Are site access points limited to the minimum number required and maintained adequately?
-
Are dust control measures adequate?
-
Are control measures implemented to prevent nuisance noise?
-
Are restricted flora and fauna areas adequately identified and fenced?
-
Is the work zone contaminated with Fire Ants?
-
Positive Observation
-
Other observations
-
Completed by (inspector)
-
Acknowledged by site representative