Title Page
-
Date
-
Prepared by
-
Location
-
Construction Site Name
-
Contractor's Site Manager and Phone No.
-
Project Manager and Phone No.
-
This Checklist is to be completed by the Project Manager at a weekly site walk with the Contractor's Site Manager. The completed checklist is to be tabled at weekly site meetings and actions noted in minutes, or as and when required by the Project Manager when no site meetings are held.
-
ALL DEFECTS MUST BE RECTIFIED IMMEDIATELY AND ACTION DOCUMENTED IN PROJECT GOVERNANCE MEETINGS
Site Area
-
Is the site securely fenced?
-
Is name & contract telephone numbers including an after-hours emergency number of the Principal Contractor displayed?
-
Is appropriate PPE signage displayed?
-
Is there a traffic management plan in place?
-
Is the floor area clear of rubbish, scattered materials with housekeeping being maintained?
-
Amenities - 1 toilet per 20 workers
-
Are there washing facilities (with soap)
-
Adequate fresh, cool drinking water
-
Are clean lunch and change rooms provided
-
Are rubbish bins provided
-
Is there a rubbish/waste container on site?
-
Are barricades, fences along, and around trenches installed with exclusion zones in place.
-
Are excavations of 1.5m or more shored, benched or battered?
-
Are there suitable and correctly tagged fire extinguishers on site.
-
Evacuation Plan is displayed ad understood by all employees.
-
Are services isolation checklist being completed for refurbishment works temporary services shutdowns?
Ladders / Scaffolding / Working at Height
-
Are scaffolds secured against tipping
-
Are handrails and toe boards in place along the full length of scaffolds with planks secured?
-
Do all leading edges including formwork decks have a compliant handrail system in place?
-
Is proper ladder access provided to the working decks and scaffold?
-
Is the scaffold is under erection, has a safety barrier been set up near the scaffolding base?
-
Are ladders in good order and secured when in use?
-
Has scaffolding of 4m or more been signed off by a licensed scaffolder/ scaffold tags.
Hazardous Substances
-
Does the site have a Hazardous substances register listing the chemicals used on-site?
-
Have Material Safety data sheets (MSDS's) been obtained for all chemicals used on?
-
Are copies of the MSDS's available?
-
Are all containers of chemicals adequately labeled (including decanted ones)
-
Have site workers using chemicals been trained in how to use the chemicals safely?
-
Is there adequate ventilation provided when in use?
-
Is there an ACM plan for the site? If yes please provide details
-
Details
Waste
-
Can the waste facility lawfully accept waste? Does the facility have a permit? What checks have been done?
-
Are waste transport/delivery dockets being checked?
-
Are any waste transport certificates required?
-
Is there any waste tracking?
-
If there are issues, how are they being addressed?
Pollution
-
Are there any water, air, land or noise pollution issues arising or likely to arise?
-
How are these issues being addressed?
Tools
-
Do the machines/tools on site have guards fitted
-
Are the leads and plugs in good condition with leads kept off the ground
-
Are hot works permits in place for all hot works?
-
Is there any electrical equipment overdue for inspection?
-
Is there a record of inspections
-
Are there explosive tools in use on site
-
Are the warning signs for explosive powered tools displayed?
-
Are operators licensed
-
Are all power supply outlets protected by earth leakage devices?
Plant & Equipment
-
Plant operators have appropriate licenses
-
All machinery has registration/ permits
-
Was a safety pin installed in the quick hitch on excavator buckets?
-
Safety check log book for machinery?
-
Backhoes/ Excavators have "Beware of Electrical Hazards" signs.
-
Is the work close to power lines &/or underground services & are workers aware of regulations?
-
Are the roads & Paths cleaned regularly and maintained free of spoil and dust?
-
Plant is in good order (Visual Inspection - No Oil leaks - Hydraulic hoses OK etc)
-
Safe working load is indicated on the boom of all cranes?
-
Vehicles have reverse alarms and rotating orange lights where necessary
-
Have dial before you dig and location ofservices been completed prior to all excavations
-
Are operators EWP that exceed 11m ticketed?
Safety Documents
-
Have Safe Work Method Statements (SWMS) been provided and reviewed for all High-Risk Construction work? Please note reviews completed this week.
WorkCover, EPA or Local Authority Visits
-
Have any WorkCover, EPA or Local Authority representative(s) attended the site since the last site meeting
-
When did they attend?
-
Were any Prohibition and Improvement Notices (PINs) issued?
-
Were there any on-the-spot fines issued to either the Contractor and/or Sub-contractor and/or employee?
Basic Points
-
Are all workers undergoing a site induction prior to starting work on site?
-
Are there records of Industry inductions and site inductions on site?
-
Are safety Helmets and safety boots being worn by all?
-
Is there clear defined access ways throughout the site
-
Are site workers wearing hearing protection whilst doing and/or working near noisy work
-
Are environmental controls in place and maintained
-
Is there a compliant first aid facility site?
-
Is there a qualified first aid person on site
-
Has the site demonstrated through inductions and site signage that it is code compliant?
Other Issues
-
Issue
-
List any other issues arising from the site walk
Completion
-
Guidelines
UN = Unsatisfactory
M = Marginal
A = Acceptable
G = Good
S = Superior -
What informal Safety rating would you give this site?
Construction Work Site Checklist General Comments about this site (Include follow up action)
-
Comment
-
Detailed Comment
Sign Off
-
Contractor's Site Manager (Signature)
-
Project Manager (Signature)