Title Page
-
Site conducted
-
Location
-
Contracted Company Name
-
Type of work being completed
-
Conducted on
-
Prepared by
Post Contract Evaluation Questions
-
1. Was the contract completed on time?
-
2. Was the contract completed on budget?
-
3. Did the contractor take all necessary steps to avoid disruption to the area?
-
4. Were there any hazards/risks generated by the Contractor?
-
5. If ‘Yes’ to Q4, were they adequately controlled?
-
6. Was the risk properly managed and documented on the correct risk assessment paperwork?<br>• Permit to Work (PTW) for Hot Work / Work at height / ‘Live’ electrical work (fault-finding)<br>• JSA – for any other medium-to-high risks work
-
7. Did the contractor(s) wear the required PPE for the tasks?
-
8. Has there been any safety or environmental incidents (including near-miss) during the contract, including causing injury or near-miss to other persons?
-
9. Were these incidents and/or near-miss reported by the contractor to Vapo/Myriad?
-
10. Did any of the reported incidents or observations suggested poor H&S practices by the contractor?
-
11. Did all contractors always adhere to the site rules? E.g. ‘no-smoking’, speed limits, using walkways, PPE, signing-in, etc.
-
12. Did the contractor report any new hazards that they were exposed to whilst completing the work that were not considered prior to the work? Note: Update hazard registers.<br>
-
13. Did all the contractors complete the Vapo/Myriad contractor Induction prior to working?
-
14. Did all contractors all have the required licenses or training certificates for the type of work they were completing? Examples.<br>• Asbestos removal license for any quantity of ‘friable’ asbestos or over 10m2 of ‘non-friable’.<br>• NZQA Forklift training (and license ‘F endorsement’ if using public areas)<br>• Digger / loader / roller / hopper - operator training<br>• NZQA Heights training if using harnesses, mobile elevated platform, scissor lifts<br>• Welding training certificate<br>• Electrician registration<br>
-
15. Overall, how would you rate the performance of the contractor based on these and other recent observations or dealings? Score 1 to 5; (1=Poor – 5=Excellent)
-
16. General Comments - include any meetings with the contractor to resolve hazards / issues / performance. Include any remedial actions that are required. Include any contractors’ comments.
Sign-off
-
Signature of person completing the form