Title Page
-
Audit Title
-
Site
-
Conducted on
-
Audit Conducted by
- Paula Lansdowne (Level 1)
- Susan Allbury (Level 1)
- Monika Kita (Level 1)
- Joan Waters (Level 1)
- Steve Reeve (Level 1)
- Tim West (Level 1)
- Fraser Nash (Level 1)
- Richard Butler (Level 1)
- Lindsay Gallie (Level 1)
- Aron Bantin (Level 1)
- Richard Wicks (Level 1)
- Brendon Nesbitt (Level 1)
- Ian Davidson (Level 1)
- Jeremy McCurrach (Level 1)
- Leif Neilsen (Level 1)
- Chris Brown (Level 1)
- David Lamerton (Level 1)
- Crispin Merritt (Level 2)
- Steve Lightfoot (Level 2)
- Denzil Searle (Level 2)
- Claire Forsyth (Level 2)
- Helen Norton (Level 2)
- Amy Bishop (Level 2)
- Donna McGovern (Level 2)
- Chris Chrigwin (Level 2)
- Dustn Rhodes (Level 2)
- Rob Thompson (Level 3)
- Lis Goulder (Level 3)
- John Mitchell (Level 3)
- Wendy Hassan (Level 3)
- Paul Tutt (Level 3)
- Mark Estes (Level 3)
- Mike Alway (Level 3)
- Andy Paulley (Level 3)
- Arjen Barnhoorn (Level 4)
- David Festa (Level 4)
- Marc Gelnett (Level 4)
-
Select auditor title from drop down list
- Cell Lead
- Supervisor
- Manager
- Quality Engineer
- Engineer
- Director
- Vice-President
-
Location
Process to be audited
-
Enter the Time the audit started
-
Select the Process Category to be audited
- Inspection (Goods In)
- Picking
- Assembly
- Labeling
- Packing
- Receiving
- Purchasing
- Put Away
- Production Order
- QC Check
- Shipping
- Testing
- Molding
-
Select 2 Receiving 'tickets'
Receiving Ticket
-
Record Supplier Name
-
Record Purchase Order Number
-
Record Line Item Number
-
Record Part number
-
Record Revision of part
-
Review procedure being used for receiving. (If hard copy, is it stamped with control status); Is the procedure available with the correct revision number?
-
Did receiving operative follow steps in procedure QP-125 to receive product?
-
Review Navision: Information entered into Nav appropriately?
-
Was the shipment checked for damaged boxes
-
Was the correct quantity received and recorded in Navision
-
Review Navision record, Was a “put-away” list generated?
-
Review paperwork received with the shipment, was all required paperwork received (delivery note / Certificate of Conformance etc)?
-
Select 3 Inspections Records
Inspection Record
-
Record Purchase Order Number
-
Record Part number
-
Record Revision of part number
-
Review IQC Criteria, verify Inspection Record captures same criteria
-
Is IQC Record Complete?
-
Review Measurements - are they within tolerances?
-
Select 2 pick lists
Work Orders
-
Does the employee know the Quality Policy or where it can be located?<br>
-
Have the correct parts been picked for the work order?
-
Are the parts in the correct inventory location designated in Navision?
-
Is the Warehouse Employee trained to the current revision of the SOP?
-
Select 1 assembly station to audit
Assembly Process
-
Assembly station ID (ie station number, process)
-
Assembler Employee ID (number, name, etc)
-
Review Work Instruction being followed, is it the current revision?
-
Was a line clearance performed prior to starting work (verify from complete)?
-
If quality alert in place, is the operator aware of the quality alert?
-
Follow process steps on Work Instruction, is the operator following the steps of the Work Instruction?
-
Are chemicals/glues at the workstation properly identified (part number and expiration)?
IMTE
-
Gauge ID
-
Is the IMTE (Inspection Measuring Test Equipment) properly identified with Gauge ID and Due Date?
-
IS the gauge in good working order?
-
Label Review: Select 3 stations where labels are being applied
Label Application Process
-
Record the Station ID where labeling is being performed
-
Record Work Order Number
-
Record Label Part Number
-
Record Label Revision
-
Compare the label to the BOM, Is the label the current part number and revision?
-
Is a Copy of the label added to the DHR?
-
Does the label match the product being packed?
-
Select 2 work orders where products are being packed into shipping carton
Packing Process
-
Record the Station ID where packing is being performed
-
Record Work Order Number
-
Are the products being packed per the Work Instruction?
-
Has the proper paperwork been generated that goes with the shipment (i.e. sterilization documentation)?
-
Are the boxes free from dents, tears, or other signs of wear?
-
Select 2 Orders that have been QC checked
QC Check Process
-
ID of product (inc serial number)
-
ID of employee (number / name etc)
-
Product ID of checked component(s)
-
Testing / accessory sheets checked (as applicable)
-
Serial numbers checked (on product, paperwork and packaging)
-
Signature(s) complete
-
Any quality alerts in place?
-
Is the operator / qc inspector aware of the quality alert?
-
Select 2 items that have been tested
Testing Process
-
ID of product (inc serial number)
-
Assembler Employee ID (number, name, etc)
-
Record Testing Instruction number
-
Record Testing Instruction revision number
-
Are all labels correct (including on product packaging)?
-
Review records, is everything within tolerances?
-
Signatures complete?
-
Select 2 Production Orders
Production Order Process
-
Record Production Order Number
-
Order picked correctly (including label requirements)?
-
Signatures and dates recorded correctly as required?
-
Does the employee know the Quality Policy or where it can be located?
-
Select 2 Purchase Orders
Purchasing Process
-
Record Supplier Name
-
Record Purchase Order Number
-
Record part number
-
Is the correct procedure being followed?
-
Information added to Nav as required (per work instruction / procedure)?
-
Sign-off / permissions approved?
-
Select 2 Shipments to check
Shipping Process
-
Does the employee know the Quality Policy or where it can be located?
-
Record Shipping Number
-
Correct parts being shipped
-
Condition of Shipping products (Great / Fair / Poor)
-
Shipment sealed correctly
-
All additional label accessories added (“tip and tell” / “shockwatch” labels added)
Signature Page
-