Title Page

  • Document nr

  • Description QA

  • Conducted on

  • Site conducted

  • Prepared by Manager

  • Site Location

Location-Building-Elevation-Zone-Floor-Grid Line

  • Location-Building-Elevation-Zone-Floor-Grid Line

QAC-Inspection Checklist

  • 1.Subcontractor Name,CSCS Card,Pictures Evidence,RAMS signature

  • 2.Linked Drawings & Details Drawings used BTS_XX_DET_TBS , Data Sheet & installation guide checked

  • 3.Continues A# L100x150x3mm thick Pre-GalvaniseAngle No1 (Aluminum) - Vertical Section with two Number fixing @ 600mm CtsMax. (1 no fixing to Horizontal SFS Track and 1 no to Vertical studs) using JT3 3 5.5 x 50 S1 Fixing - Galvanized Steel Angleto SFS Studs, 2no x JT3-3-5.5 x 50 S 16 @600 vertical cts

  • 3.1.Continues B # L150x100x3,Grade S275 continous Galvanized Steel Angle Swisspearl Zenor Cladding, Galvanized Steel Angle to SFS Fixing - JT3 3 5.5 x 50 S16

  • 4.Housewrap Breather Membrane Tyvek Firecurb sealed to Angle, checked to spec, seal /tape all joints with Tape. Horizontal laps should be at least 100 mm and vertical laps 150 mm. Vertical laps should be staggered wherever possible. External corner min 300mm

  • 5. Aluminum Retention Bracket 3mm and Insect mesh ,Fixing - Retention Bracket to 3mm,Cortex 0500 FR Class B EPDM 0.5mm thick and CORTEX 0771 FR Class B Paste Adhesive on to Y-Wall and to Roofing Membrane Galvanized Steel Angle, JT3-3-5.5 x 50 - S16

Hold Point Inspection putting a hold on construction activities until the inspection above is passed. Is a mandatory verification point beyond which a work process cannot proceed without authorisation by the contract administrator. Hold points are usually assigned to those critical aspects of the work that cannot be inspected or corrected at a later stage because they will no longer be accessible.

  • 6. Aluminum Coping 2mm thick Color RAL 9007 Matt, check spec, allow min 3mm gap at the joint for thermal expansion, Fixings Checked at each bracket location, DF3-SSA4-PL-S19-5.5 x 25 RAL 9007 Matt.Note: Coping to have oversize hole of 14mm Ø and one fixed point 5.5mm Ø Holes.Fixed to every bracket

  • 13.Invoice no & Mark up Drawing (BTS Reference )

  • 14.Subcontractor Installers & Supervisor name,pictures, cscs cards

Comments

  • COMMENT Reference & Descrition

  • Comments Reference & Description date when closed (BUILD THERM)

Hand Over Joint Inspection

  • Hand Over -Cladding free from damage-Facades to be viewed as per the BBA, in daylight from a distance of not less than 10m. Some variation in colour and texture of external walls is inevitable and in certain cases is a feature. A façade for instance should be inspected for scratches or minor imperfections from a distance of min 5m, if a scratch cannot be seen from that distance then it is not a defect except if a scratch has gone through the full depth of the coating exposing the raw metal below.

  • On behalf of Build Therm (name)

  • On behalf of Main Contractor (name)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.