Information

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. General

  • 1.1 Was company representative on site?<br>

  • 1.2 Are all Safety/HazCom Programs on site? (1926.59)

  • 1.3 Are OSHA posters/emergency numbers posted? (1903.2)

  • 1.4 Are safety meetings held/documented? (1926.21[a][2])

  • 1.5 Are first aid kits available & properly stocked? (1926.50[d])

  • 1.6 Are fire extinguishers available/charged/inspected? (1926 .150[a])

  • 1.7 Are all rebar/pipe & other impalement hazards capped/protected? (1926.701[b])

  • 1.8 Are gas cylinders properly used & stored? (1926.55)

  • 1.9 Is housekeeping and sanitation proper & enforced? (1926.25)

  • 1.10 Are flammable materials in approved containers, properly labeled and stored? (1926.152)

  • 1.11 Are barricades/traffic control/flagmen through & around site proper? (1926 Subpart G)

  • 1.12 Are all silica exposures in compliance?

2. Equipment

  • Is equipment involved?

  • 2.1 Are parts/equipment free from damage? (1926.300[a])

  • 2.2 Are all guards in place & working properly? (1926.300[b][1])

  • 2.3 Do backup alarms work? (1926.601[b][4][i])

  • 2.4 Are equipment operators properly trained? (1910.178[l][2])

  • 2.5 Are seatbelts operative & used? (1926.601[b][9])

  • 2.6 Are aerial/scissors lifts properly used? (1926.453)

  • 2.6 Are forklifts being properly used/operated? (1910.178)

3. Personal Protective Equipment

  • Is PPE involved?

  • 3.1 Is all PPE provided by the employer? (1926.95[d][6])

  • 3.2 Is respiratory protection proper? (1926.103)

  • 3.3 Is hearing protection used & proper? (1926.101)

  • 3.4 Is proper head/eye/foot protection worn? (1926.96)

  • 3.5 Is hand protection/clothing proper? (Common sense)<br>

  • 3.6 Is PPE hazard assessment complete & on file? (1910.132[d][1])

  • 3.7 Is Appendix D on file for voluntary respirator use? (1910.134/1926.103)

4. Electrical

  • Is electrical involved?

  • 4.1 Are GFCI's or AEG Program in use? (1926.404[b][1][i])

  • 4.2 Is temporary lighting used & proper? (1926.405[a][2][ii][F])

  • 4.3 Are Lockout/Tagout procedures in place & used? (1926.417)

  • 4.4 Are temporary cords properly used & maintained? (1926.405[a][2])

  • 4.5 Do all boxes/panels have covers & are all circuits labeled? (1926.405[b])

  • 4.6 Are generators over 5kv properly grounded? (1926.404[b][1][ii])

  • 4.7. Are all operations performed at least 10 feet from overhead power lines? (1926 Subparts L and CC)

5. Fall Protection

  • Is fall protection involved?

  • 5.1. Is fall protection provided at heights over 6 feet? (1926.501[b])

  • 5.2 Is fall protection equipment inspected & maintained? (1926.502[d][21])

  • 5.3 Are stairways properly protected & used? (1926.1051)

  • 5.4 Are ladders properly used & maintained? (1926.1051)

  • 5.5 Are all floors holes properly covered or protected? (1926.502[i])

  • 5.6 Is the roofer's warning line system/roof monitor system proper? (1926.502[f]&[h])

6. Steel Erection/Cranes

  • Is steel erection/cranes involved?

  • 6.1 Is crane setup proper/annual inspection on site? (1926.1403) & (1926.1412[f][7])

  • 6.2 Are loads properly rigged/carried? (1926.753[d][2][iii])

  • 6.3 Are areas under swinging loads properly barricaded & enforced? (1926.753[d])

  • 6.4 Are rigger & signalperson trained/qualified? (1926.1428[a])

  • 6.5 Are connector requirements in compliance? (1926.760[b])

  • 6.6 Does Controlled Decking Zone meet standards. (1926.760[c])

  • 6.7 Are employees using fall protection above 15 feet? (1926.760[a][1])

  • 6.8 Are oxygen & acetylene bottles properly used & stored? (1910.101[b])

  • 6.9 Is perimeter safety cable properly installed & used? (1926.760[a][2])

7. Masonry/Scaffolding

  • Is masonry/scaffolding involved?

  • 7.1 Is scaffold competent person on site? (1926.451[a][6])

  • 7.2 Are all scaffold users properly trained? (1926.454)

  • 7.3 Are scaffold erection/disassembly procedures proper? (1926.451[b])

  • 7.4 Are baseplates/mud sills stable & proper? (1926.451[c][2][i])

  • 7.5 Are all scaffold frames pinned together? (1926.452[c][4])

  • 7.6 Is scaffold tied to structure using stiffbacks? (1926.451[c][1])

  • 7.7 Are scaffold frames/planks/parts free of damage & defects? (1926.451[f][3])

  • 7.8 Are guardrails properly installed & used? (1926.451[g][1][v])

  • 7.9 Are toe boards/warning line properly installed & used? (1926.451[h])

  • 7.10 Is scaffold access proper? (1926.451[e])

  • 7.11 Are masonry walls properly braced? (1926.706[b])

  • 7.12 Is the Limited Access Zone set & enforced? (1926.706[a])

  • 7.13 Are mixer operations proper? (1926.702[b])

  • 7.14 Is wet-cutting or respiratory protection in place? (1910.134)

  • 7.15 Is scaffolding properly tagged in/out of service?

8. Trenching/Excavating

  • Is trenching/excavating involved?

  • 8.1 Is the trench competent person on site? (1926 Subpart P)

  • 8.2 Is the trench/excavation inspected daily? (1926.651[k][1])

  • 8.3 Has a proper soils analysis been conducted? (1926 Subpart P)

  • 8.4 What is the soil type? (1926 Subpart P, Appendix A)

  • 8.5 Is employee protection proper for soil type & depth? (1926.652[a])

  • 8.6 What type of employee protection is in place? (1926.652[a])

  • 8.7 Is safe access/egress provided? (1926.651[c])

  • 8.8 Are water removal procedures proper? (1926.651[h])

  • 8.9 Has the trench been evaluated as a confined space? (1926 Subpart P)

9. Confined Spaces

  • Are confined spaces involved?

  • 9.1. Are confined spaces identified/signs posted?

  • 9.2 Do all contractors have a written confined space program?

  • 9.3. All all employees trained/documentation available?

  • 9.4. Is all equipment on hand (air/gas monitor, rescue, etc)?

  • 9.5. Are all confined space rules being followed?

10. Summary

  • Comments

  • Photographs

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.