Title Page
-
Conducted on
-
Document Ref:
-
Inspector
-
Location
-
Department
-
Work Type
- Excavation
- Pipe Installation
- Cable Laying
- Jointing
- Reinstatement
- Other
Site Details
-
Job Reference
-
Team Supervisor
-
Team Leader
-
Sub Contractor - if applicable
-
Cient
-
Abortive Visit
Administration
-
Identification Cards (ID) available
-
Safe digs and pipeline / utility search results available on site
-
Work Instruction / Job Pack on site
-
Risk Assessment completed for site
-
Site operatives wearing all correct Corporate Work Wear
Site Safety
-
Is the site tidy / good housekeeping
-
Services marked / pilot holes taken where necessary
-
HI Viz / Hard Hat and other PPE worn where risk exists / identified
-
Excavation safe and shored where necessary
Signing, Lighting and Gaurding
-
Information / Permit / Apology Board (with MMG or Client contact telephone no.)
-
Vehicles and equipment positioned safely
-
Signs – spacing, size, condition, weighted
-
Safety zones – lead in and exit tapers provided
-
Cones and barriers – location, size, condition
-
Pedestrian walkway – minimum width, ramps provided where required
-
Correct type of traffic management provided as per COP, if using traffic lights, are stop / go boards available (in case of traffic light failure)
-
Stores and materials guarded
Plant, Tools, Equipment and Vehicles
-
Correct plant, tools and equipment being used
-
Plant, tools and equipment in good condition
Environmental
-
Spoil / waste segregated and sited correctly
Stop Work
-
Does the work need to stop for any reason
If there are any non-compliances (or NO’s) to the above, please give details below
-
Summary of findings
Sign Off
-
Team Leader
-
Inspector