Title Page
-
Date Time
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Quarry Manager
-
Divisional Director
-
Location
1. Documentation
-
Health & Safety Policy on display and in date
-
Organisational chart up to date and displayed
-
Roles & Responsibilities identified
-
Letter of appointment displayed and signed
-
Geo-tech Survey complete
-
Traffic Management Plan in place
2. Training
-
Quarry Managers training in place
-
Tip & Excavation training in place
-
Quarry operatives training in place
-
First Aid training in place
-
Fire Marshall training in place
-
Emergency training in place
3. Legislation Documentation
-
Risk Assessments
-
COSHH assessments
-
Safe System of Work
-
Method Statements
-
Individual procedures for all operations communicated and signed up
-
Permit to Work procedures
-
Lock out tag procedures in place
-
Visitor control
-
Working at Height procedures
-
Inductions
-
Toolbox talks (twice monthly)
-
Quarterly H&S Meeting minutes filed
-
Noise /Dust/Vibration assessments carried out
-
Health Awareness / Health Surveillance
4. Control of Contractors
-
Risk Assessments & Method Statements
-
Permit to Work
-
Training
-
Induction
4. Site Welfare
-
Canteen facilities
-
Facilities for drying clothes
-
Washing / Toilet Facilities
5. Fire & Emergency
-
Cylinders upright & secure
-
Emergency Plan & Numbers displayed
-
Fire exits clear
-
Fire Extinguishers Serviced and full
-
Welding screens available
-
First Aid Facilities & Provision
6. Hazardous Substances
-
Eyewash available in chemical use area
-
Flammable stored appropriately
-
Fuel bowser free from leaks
-
Minimum amount of chemicals used at workstations
-
Oil filters / absorbent so placed in appropriate bins
-
Spill kits available / special waste disposed of properly
-
Storage & Labelling adequate for all chemicals
-
All substances bundled adequately
7. Plant / Lifting Equipment
-
Mobile crusher adequately guarded
-
Access to conveyors & plant clear
-
LOLER Certs available?
-
Have Lifting accessories been tested every six months?
-
All plant guarded
-
Excavation platforms adequate & safe distance from face
-
Vehicle pre-ops completed & closed out
-
Fixed and Mobile Plant pre-ops completed
-
Vehicles operated in safe manner
-
Reversing bleepers and camera on mobile plant operational
-
Maintenance records of all plant recorded
-
Weekly brake test on all plant carried out and recorded on fixed plant & quarterly extended brake tests carried out
8. Power Tools/ Electricity/ Inspections
-
Fixed wire testing carried out every 6 months?
-
Equipment PAT tested and records available annually
-
Lighting adequate in work areas
9. Signage
-
Adequate warning signage
-
Adequate speed signs
-
First Aid Signage 2
-
Fire / Emergency Signage
-
Lift buoys available
10. Working Area - Quarry Inspections
-
Quarry Inspection Sheets completed?
-
Aggregate storage adequate
-
Roadways - clean and clear of spillage / obstructions / defined
-
Dust suppression
-
Housekeeping / Material Storage
-
Leading Edge Protection 1.5m
-
Quarry face stable (7m - Gravel) (15m Blasting
-
Manual handling Controls
-
Vibration Controls
11. Environmental Controls
-
Drip trays used
-
Spill kits in place
-
No machinery leaking oil
-
Correct storage and bunding of IBCs
13. Waste Management
-
Waste documentation, (waste carriers licence, transfer notes, final destination licence) storage, recycling
14. Environmental Management
-
Water Quality results within parameters?
-
Environmental logs, discharge consent, silt management, interceptors
Sign off
-
Auditee to sign
-
Auditor to sign