Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select date

Health & Safety

  • Employees within the area understand and demonstrate the 5 Key Safe Behaviours?

  • Is the area SAFE and FREE from hazards?

  • Electric pallet truck scarf tag signed by trained operator

  • X-ray curtains all present and in correct position

CCP

  • All X-Ray Machines are functioning and checks complete in accordance with CFILL31 have been observed, reject line doors are kept locked

  • Warm fill sheet are at line when / where required and completed in accordance with CFILL.30

Chemical Control

  • All chemicals stored in locked COSHH cabinets when not in use including chain oil. CGEN.04

Paperwork & Documentation

  • All paperwork is on the correct Centuri document number

  • All paperwork is correctly completed and any corrections have been made in accordance with the Paperwork - Record Completion & Maintainance procedure

  • Weight checks complete in accordance with CFILL.05

  • Each order has been correctly documented, foil and tray label checks have been complete in accordance with CFILL.50

  • Daily and monthly glass registers are up to date

Hygiene & Fabrication

  • All fillers are clean, free from foreign bodies, debris and excess grease internally, externally and underneath

  • End of line equipment including conveyors and x-rays are clean and free from debris internally and externally

  • Absence of selotape engineering

  • All floors and drains are clean and free from debris

  • Cleaning equipment such as brushes are clean and stored on the correct shadow boards. CGEN 03.

  • Cleaning schedules are complete and up to date for daily, weekly and monthly tasks

  • Internal building fabrication such as walls and floors are in a good state of repair

Operator Asset Care

  • The Inkjet OAC schedule is up to date for daily, weekly and monthly tasks

  • Spare inkjets coders are running on all fillers.

  • The Logopak OAC schedule is up to date for daily, weekly and monthly tasks

5s

  • Area audits complete to schedule and evidently compliant with visual standards , logopak cabinets have been replenished

  • Foil cabinet audits are complete

  • All SIC boards are up to date with actions when hourly targets have not been met

  • Ink and additive stock are above minimum level ( ink 50 bottles / additive 100 bottles ) . Teamleder informed if minimum stock level not met and stock ordered.

  • Radios x 3 working and in good condition.

Other Information

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.