Information

  • Company

  • Supervisor
  • Client

  • Date

  • Location
  • Prepared By:

Documentation (Complete for All Jobs)

  • Are all sections of the THA completed?

  • Are all equipment operators listed in the THA?

  • Was previous work days Post Job Briefing completed as required?

High Energy Hazard Identification and Controls

  • Are one or more high energy hazards present for work being performed (gravity, motion, mechanical, electrical, pressure, sound, radiation, biological, chemical, temperature)

  • Were adequate direct controls in place for stored energy/ Line of Fire hazards

  • Were adequate direct controls in place for Gravity (Suspended Load/ Falls From Elevation)

  • Were adequate direct controls in place for Motion (Mobile equipment and workers on foot/ Motor Vehicle Accident/ Equipment Vehicle Roll Over)

  • Were adequate direct controls in place for Electrical (Electrical Contact With Source/ Arc Flash)

  • Were adequate direct controls in place for Temperature (Steam/ High Temperature/ Fire with Sustained Fuel Source)

  • Were adequate direct controls in place for Pressure (Explosion/ Excavation or Trench)

  • Were adequate direct controls in place for Mechanical (Heavy Rotating Equipment)

  • Were adequate direct controls in place for Chemical (High Dose of Chemical or Radiation/ Confined Space)

Housekeeping (Complete for All Jobs)

  • Is housekeeping in regards to trash/materials/debris satisfactory

PPE (Complete for All Jobs)

  • All required PPE in use as required for tasks being performed

Energized Work

  • Are energized equipment or lines present?

  • Are energized equipment or lines properly addressed and adequate mitigation in place?

Grounding

  • Lines de-energized, tested and grounded as required

  • Grounding Log present

Clearance Orders

  • Clearance Orders

Work Zone Protection

  • Traffic Control present for operations being performed

  • Are drop zone barricades set up appropriately?

Rigging

  • Rigging equipment in use is in good condition/inspected

Excavations

  • Excavations or excavating tasks present on job site inspected by competent person and have adequate protective systems in place

Environmental

  • Are all environmental hazards identified and mitigated?

Equipment

  • Outrigger pads in place for all lifting equipment

  • Equipment safety zone is properly delineated to control Step/ Touch Potential and/ or swinging mast pinch points

  • Equipment is chocked as required

  • Pre‐/post‐use inspections complete

Substation

  • Qualified station-entry personnel onsite and crew reported into dispatch

Tools

  • Have tools in use been inspected and used as intended?

Crew Member Names

  • undefined

Additional Comments

  • undefined

Sign-Off

  • Supervisor/Foreman Signature

  • Auditor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.