Title Page

  • Company

  • Permit Number

  • Conducted on

  • Conducted by

  • Position

Permit Monitoring

Permit Details

  • Description of work

  • Location of work

  • Are the names detailed on the permit correct?

  • Has the permit been signed and a contractor pass issued?

RAMS Audit

  • Are the RAMS and other documentation relevant and accurate?

  • Are the works being carried out considered high risk?

  • Has a fully functioning radio been issued to the contractor and training given on how to use the radio?

  • Are regular checks being carried out to ensure the continuous safety of the contractor?

  • Does the contractor have the relevant certification with them (e.g. IPAF)

  • Are the contractors using access equipment owned by Regent's Place?

  • What access equipment is being used?

  • Please specify

  • Has the relevant access equipment logbook been filled out correctly?

  • Inform the contractor to stop work immediately and complete the logbook. Also investigate with security on why keys for access equipment were handed out before the completion of the logbook.

  • Are the contractors using in date harnesses and all tools & equipment are lanyarded

  • Are there any systems isolations in place?

  • Enter details of the isolations.

  • Is the area clear of flammable and combustible substances?

  • Is there a need for an isolation to be in place?

  • What is isolated and the location of the isolation?

  • Are the contractors working in accordance with the controls identified on the permit?

  • Inform the contractor to stop work and read through the controls listed on the permit?

  • Add drawing

  • Is the relevant Manufacturers Safety Data Sheet attached to the permit?

  • Is the MSDS dated within three years of the current date?

  • Are the contractors conforming with the guidelines that are set by the MSDS'?

  • Inform the contractors to stop and ensure that they read the MSDS guidelines.

Contractor Monitoring

Contractor Standards Check

  • Are the works suitably cordoned off with the use of barriers.

  • Are the contractors able to identify the risks involved with the works being carried out?

  • Are the contractors working in accordance with the method statement?

  • Are the contractors wearing PPE that is appropriate to the task they are undertaking?

  • Stop the work immediately and instruct the contractor to don the appropriate PPE.

  • Are the contractors behaving in a suitable manor?

Overview of Contractor Performance.

Summary

  • In your opinion are the works being carried out safe?

  • Please score the contractor performance below. Scoring ranges from 1-5 with 1 being significantly below expected standard, 3 being average and 5 working above and beyond what is expected.

  • Behaviour - Contributing factors to be considered such as general attitude towards staff and general public.

  • Performance - Contractors carrying out the works as per the RAMS, working safely and good housekeeping standards.

  • If at any point the works were stopped then you are to inform the relevant property management team

Completion of Monitoring

  • Complete by

  • Position

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.