Reinforcement
-
Site
-
Description
-
Prepared by
-
Sub Contractor / Self-Delivery
-
Sub Contractor
-
Location
-
Drawing Reference
Work Item
Preparation
-
Date
-
Bars and Mesh as specification
-
Blinding complete and correct
-
Formwork complete and correct
-
CARES Cert received
-
Membrane required
-
Membrane Specified
-
Method Statement/Risk Assessment In place
Application
-
Date
-
Bars and Mesh as Drawings and Schedules
-
Fixing /Splice/ Tying as Drawings and Specification
-
Spacing / Cover as Drawings and Specification
-
Membrane undisturbed
-
Formwork undisturbed
Final Inspection
-
All areas complete for final inspection
-
Notification of Inspection raised
-
Approved for commencement of next Trade
Remarks
-
undefined
Final Sign Off
Name & Signature
-
For Brims -
-
For Client