Concrete Placing
-
Site
-
Description
-
Prepared by
-
Sub Contractor / Self-Delivery
-
Sub Contractor
-
Location
-
Drawing Reference
Work Item
Preparation
-
Date
-
Setting out information, levels and dimensions correct
-
Blinding accuracy level and trim
-
Formwork accuracy plumb, level and supported
-
Damp proof membrane intact, and laps correct
-
Reinforcement Inspection Sheet Complete
-
Cast In Items type and set out
-
Number of and type of Cast In Items
-
Area cleaned out
-
Specification requirements for Surface Finish
-
Concrete Type and Strength requirements
-
Method Statement/Risk Assessment in place
Application
-
Date
-
Concrete correctly placed
-
Test cubes taken and recorded
-
Surface finish correct to specification
-
Thermocouples installed
-
Protection in place
Final Inspection
-
All areas complete for final inspection
-
Notification of Inspection raised
-
Approved for commencement of next Trade
Remarks
-
undefined
Final Sign Off
Name & Signature
-
For Brims -
-
For Client