Second Fix Joinery

  • Site

  • Description

  • Prepared by

  • Sub Contractor / Self-Delivery

  • Sub Contractor

  • Location

  • Drawing Reference

Work Item

Preparation

  • Date

  • Plastering / First Fix Inspection sheets complete

  • Ironmongery sets packaged

  • "Fire" requirements, Strips / Seals, etc., identified

  • Fixing requirements known

  • Method Statements/Risk Assessments in place

Application

  • Date

  • Fitting tolerance correct

  • Fittings plumb and lined

  • Fittings protected

Final Inspection

  • All areas complete for final inspection

  • Notification of Inspection raised

  • Approved for commencement of next Trade

Remarks

  • undefined

Final Sign Off

Name & Signature

  • For Brims -

  • For Client

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.