Second Fix Joinery
-
Site
-
Description
-
Prepared by
-
Sub Contractor / Self-Delivery
-
Sub Contractor
-
Location
-
Drawing Reference
Work Item
Preparation
-
Date
-
Plastering / First Fix Inspection sheets complete
-
Ironmongery sets packaged
-
"Fire" requirements, Strips / Seals, etc., identified
-
Fixing requirements known
-
Method Statements/Risk Assessments in place
Application
-
Date
-
Fitting tolerance correct
-
Fittings plumb and lined
-
Fittings protected
Final Inspection
-
All areas complete for final inspection
-
Notification of Inspection raised
-
Approved for commencement of next Trade
Remarks
-
undefined
Final Sign Off
Name & Signature
-
For Brims -
-
For Client