Title Page

  • Site conducted

  • Engineer carrying out Report

  • Date & time of arrival

Address Details

  • Residents name

  • Development

  • Address

  • Postcode

Engineers Report

Health and Safety

  • Have you checked the property is safe to enter if there has been a leak - Has the electricity tripped or is the water is live? - Provide a brief description of any risk (Electrics can be isolated at 3 different locations, either in meter cabinet, riser or fuseboard - if unsure organise electrician to attend)

  • Risk Assessment of Resident House - Have you noticed anything that maybe dangerous and asked client to move it? Provide brief description of any and what you doing to make the risk acceptable

  • Personal Risk Assessment - Think of slips, trips and falls, working at height and manual handling - Provide a brief description of any risks and what you doing to make the risk acceptable

  • Have you completed HS46 HAVS - Vibration Exposure Record?

  • Has the occupant giving you access confirmed they are 18 or over?

Location of Defect

  • What is the defect reported?

  • Location of defect reported

  • Take detailed and multiple photos of working area - Showing surrounding areas and defect

Defect Report - Assessment

  • Has damaged occurred to the property that will require repairs by other trades?

  • Is it Damage (<£2,000) or Extreme Damage (£2,000-£30,000)

  • Have you isolated the water?

  • Call the office to update on the situation

  • Have you explained the Extreme Damage Policy to the Homeowner?

  • Take detailed and multiple pictures of all damages before completing any works

  • Take detailed and multiple pictures of faulty fitting before rectifying

  • Description - Works carried out

  • Have you bagged the evidence?

  • Take detailed and multiple pictures of all damaged area after completing any works

  • Parts Required?

  • What part is required - including manufacturer and part number?

  • Why is new part required?

  • Is the part installation fault?

  • Is the part manufacturer fault?

  • Take detailed and multiple pictures of the part

Sign off

  • Take photo of completed work area:

  • Customer Present?

  • Keys Supplied?

  • Representative?

  • Chargeable?

  • CE?

  • Our responsibility in respect of firestopping is to notify of any damage or holes made during our corrective and this report serves as our notification to the builder - Please advise on any correction works?

  • Customer Signature

  • Engineer Signature

  • Provide date and time finished in property

  • Did you use materials, if so what parts did you use - Qty & Part

  • Further Works Required?

  • Description of further works required?

  • Why are further works required?

  • Do other trades need to attend?

  • Is it installation fault?

  • Is it manufacturer fault?

Sign off

  • Take photo of completed work area:

  • Customer Present?

  • Keys Supplied?

  • Representative?

  • Chargeable?

  • CE?

  • Our responsibility in respect of firestopping is to notify of any damage or holes made during our corrective and this report serves as our notification to the builder - Please advise on any correction works?

  • Task complete?

  • Job Complete?

  • Customer Signature

  • Engineer Signature

  • Provide date and time finished in property

  • Have you isolated the water?

  • Take detailed and multiple pictures of all damages before completing any works

  • Take detailed and multiple pictures of faulty fitting before rectifying

  • Description - Works carried out

  • Take detailed and multiple pictures of all damaged areas after completing works

  • Parts Required

  • What part is required - including manufacturer and part number?

  • Why is new part required?

  • Is the part installation fault?

  • Is the part manufacturer fault?

  • Take detailed and multiple pictures of the part

Sign off

  • Take photo of completed work area:

  • Customer Present?

  • Keys Supplied?

  • Representative?

  • Chargeable?

  • CE?

  • Our responsibility in respect of firestopping is to notify of any damage or holes made during our corrective and this report serves as our notification to the builder - Please advise on any correction works?

  • Customer Signature

  • Engineer Signature

  • Provide date and time finished in property

  • Did you use materials, if so what parts did you use - Qty & Part

  • Further works required?

  • Description of further works required

  • Why are further works required?

  • Do other trades need to attend?

  • Is it installation fault?

  • Is it manufacturer fault?

Sign off

  • Take photo of completed work area:

  • Customer Present?

  • Keys Supplied?

  • Representative?

  • Chargeable?

  • CE?

  • Our responsibility in respect of firestopping is to notify of any damage or holes made during our corrective and this report serves as our notification to the builder - Please advise on any correction works?

  • Task complete?

  • Job Complete?

  • Customer Signature

  • Engineer Signature

  • Provide date and time finished in property

  • Description - Works carried out

  • Parts required?

  • What part is required - Including manufacturer and part number?

  • Why is the part required?

  • Is the part installation fault?

  • Is the part manufacturer fault?

  • Take detailed and multiple pictures of the part

Sign off

  • Take photo of final work space - showing surrounding areas and complete defect:

  • Customer present?

  • Keys supplied?

  • Representative?

  • Chargeable?

  • CE?

  • Our responsibility in respect of firestopping is to notify of any damage or holes made during our corrective and this report serves as our notification to the builder - Please advise on any correction works?

  • Customer Signature

  • Engineers Signature

  • Date and time of leaving property

  • Did you use materials, if so what parts did you use? - Qty & Part

  • Further Works required?

  • Description of further works required

  • Why are further works required?

  • Do other trades need to attend?

  • Is it installation fault?

  • Is it manufacturer fault?

Sign off

  • Take photo of completed work area:

  • Customer present?

  • Keys supplied?

  • Representative?

  • Chargeable?

  • CE?

  • Our responsibility in respect of firestopping is to notify of any damage or holes made during our corrective and this report serves as our notification to the builder - Please advise on any correction works?

  • Task Complete?

  • Job Complete?

  • Customer signature

  • Engineers Signature

  • Provide date and time finished in property

Customer Satisfaction Survey

  • Laser M&E objective is to provide 100% customer satisfaction on each call. I confirm that I am 100% happy with the way my call has been handled today and have been given the opportunity to state otherwise.

  • Any comments to add?

  • Please briefly describe your reasons so that your feedback can be considered in our review process.

  • How do you feel Laser Mechanical & Electrical has handled your defect?

  • Please can you explain why your experience was unsatisfactory and do you have any comments on how we can improve?

  • Any comments to add?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.