Information

  • Document No.

  • Audit Title (Mandatory Requirement)

  • Conducted on

  • Auditor

INSTALLATION DETAILS

  • Date and Time:

  • Name of Occupant:

  • Address:
  • Contractor Company:

  • If 'Other' Please insert Company Name

  • Installation Engineer(s)

  • Completion Date:

PLEASE SELECT FROM ONE OF THE FOLLOWING AUDITS

  • Multiple audits can be completed if required.

    IMPORTANT NOTICE:

    It is a mandatory requirement that the Occupant/Home Owner and the Assessor sign this report upon completed.

  • Gas QA Audit

BOILER INSTALLATION QA AUDIT

  • Gas safety cert completed correctly?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • System installed to specification?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Appliance location satisfactory?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Filter Straight?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Flue clipped to M.I?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Installed to M.I?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Discharge pipe to current place?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Condensate pipe to M.I?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Flue termination to standard?<br>

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Gas supply to boiler as per M.I?

  • Insert Comment:

  • Insert Comment:

  • Benchmark log book completed?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Meter installed to standard?

  • Insert Comment:

  • Insert Comment:

  • Insert the Working Pressure:

  • Insert the Gas Pressure:

GENERAL INSTALLATION CHECK

  • Radiators correctly installed?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Lock shield valves in room with roomstat?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Pipework correctly installed?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Water leaks apparent?

  • Insert Image:

  • Insert Comment:

  • Safety labels and notices fitted?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Flue made good internal & external

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Other reinstatements satisfactory?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Warranty details completed?

  • Insert Comment:

  • Insert Comment:

  • System installed to Part L Building Regulations?

  • Insert Comment:

  • Insert Comment:

  • Electrical QA Audit

ELECTRICAL QA AUDIT

  • Has RCD Protection been provided to the works/circuit being worked on?

  • Type of Main Incoming Electrical Supply?

  • NOTE:

    BOTH GAS AND WATER EARTHS MUST BE PRESENT.
    MINIMUM CABLE CSA IS 6.0mm
    MAIN EARTH TO FUSE BOARD MUST HAVE A CSA OF 10.0mm

    Key: CSA - Cross Sectional Area

  • NOTE:

    BOTH GAS AND WATER EARTHS MUST BE PRESENT.
    MINIMUM CABLE CSA IS 10.0mm
    MAIN EARTH TO FUSE BOARD MUST HAVE A CSA OF 16.0mm

    Key: CSA - Cross Sectional Area

  • THE WHOLE PROPERTY MUST HAVE RCD PROTECTION NO EXCEPTIONS

    NOTE:

    BOTH GAS AND WATER EARTHS MUST BE PRESENT.
    MINIMUM CABLE CSA IS 10.0mm
    MAIN EARTH TO FUSE BOARD MUST HAVE A CSA OF 16.0mm

    Key: CSA - Cross Sectional Area

  • Main Water Bond Visible?

  • Is the clamp within 300mm of the services?

  • Is the clamp tight and secure?

  • Select CSA of the cable

  • WARNING - NOT COMPLIANT UPGRADE REQUIRED

  • WARNING - NOT COMPLIANT UPGRADE REQUIRED

  • COMPLIANT - HOWEVER UPGRADE RECOMMENDED TO BRING UPTO 17th EDITION WIRING REGULATIONS

  • COMPLIANT

  • THE EARTH BOND MUST BE PRESENT TO COMPLY WITH 17th EDITION WIRING REGULATIONS.

    PLEASE MAKE ARRANGEMENTS WITH VALLEY SERVICES HEAD OFFICES FOR THESE WORKS TO BE COMPLETED.

  • Main Gas Bond Visible?

  • Is the clamp within 300mm of the services?

  • Is the clamp tight and secure?

  • Select CSA of the cable

  • WARNING - NOT COMPLIANT UPGRADE REQUIRED

  • WARNING - NOT COMPLIANT UPGRADE REQUIRED

  • COMPLIANT - HOWEVER UPGRADE RECOMMENDED TO BRING UPTO 17th EDITION WIRING REGULATIONS

  • COMPLIANT

  • THE EARTH BOND MUST BE PRESENT TO COMPLY WITH 17th EDITION WIRING REGULATIONS.

    PLEASE MAKE ARRANGEMENTS WITH VALLEY SERVICES HEAD OFFICES FOR THESE WORKS TO BE COMPLETED.

  • Installation of fused spur

  • IMPORTANT NOTICE - please check and confirm the fuse size in accordance with manufacture recommendations.

  • Fuse Size:

  • Refer to manufacturers requirements to confirm 5 amp is adequate.

  • IMPORTANT NOTICE - Incorrect fuse size, please install the correct size.

  • Programmer installed satisfactory?

  • Room thermostat satisfactory?

  • Comments in relation to any item in this section.

  • Health & Safety Audit

HEALTH & SAFETY AUDIT

  • 1.0 CUSTOMER SERVICE/VEHICLES

  • Are the appearance of the engineers and vehicles acceptable?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Are company ID Cards available.

  • Insert Comment:

  • Insert Comment:

  • Has the customer been advised on the installation process and hazards?

  • Insert Comment:

  • Insert Comment:

  • Is/are the vehicles road worthy and parked safely?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Are clean dust sheets being used?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Are sign boards evident?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Are clean dust sheets being used?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Is the work area tidy and safe with I obstructed access and egress?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Is the work area tidy and safe with I obstructed access and egress?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • 2.0 PPE AND WORK EQUIPMENT

  • Is the work being carried out in a safe manner using appropriate PPE?

  • Insert Comment:

  • Insert Comment:

  • Are the engineers in possession of calibrated flue test analyser?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Are all 230v equipment protected by a RCD device?

  • Insert Comment:

  • Insert Comment:

  • Is all electrical field equipment free from damage?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Do engineers have suitable portable lighting?

  • Insert Comment:

  • Insert Comment:

  • Do engineers have means of extinguishing smoulders or fires?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Do teams have first aid kits and eye wash available?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Is access equipment marked with a unique ID for routine inspection?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • 3.0 METHOD OF WORK

  • Safe working at height, using correct equipment?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • Slips/trips and fall hazards identified with appropriate control measures put in place?

  • Insert Comment:

  • Insert Comment:

  • Do fitters have suitable and sufficient Pre-work risk assesment?

  • Insert Comment:

  • Insert Comment:

  • Are appropriate manual handling techniques being employed?

  • Insert Comment:

  • Insert Comment:

  • Have the teams undertaken relevant tightness tests and recorded results?

  • Insert Comment:

  • Insert Comment:

  • Is the correct equipment for flushing the system available?

  • Insert Comment:

  • Insert Comment:

  • Is an inhibitor available once the system has been flushed?

  • Insert Comment:

  • Insert Comment:

  • Are the engineers aware of incident reporting and emergency procedures?

  • Insert Comment:

  • Insert Comment:

  • Are the engineers able to describe the potential hazards associated with the activity?

  • Insert Comment:

  • Insert Comment:

  • Do engineers have access to current generic:

  • Risk Assesment?

  • Method Statement?

  • COSHH Assesment?

  • Comments:

  • Are the engineers aware of how to dispose of waste materials (At Valley Services Head Office)?

  • Insert Image:

  • Insert Comment:

  • Have the engineers addressed the duty of care to inspect all gas appliances?

  • Insert Comment:

  • Insert Comment:

  • We're risks handled correctly - 'Unsafe Situation' - 'At Risk' - ' Immediate Danger'

  • Insert Comment:

  • Insert Comment:

  • Are arrangements acceptable for confined space entry?

  • Insert Comment:

  • Insert Comment:

  • When core drilling has the area been demarcated?

  • Insert Image:

  • Insert Comment:

  • Insert Image:

  • Insert Comment:

  • COMPETENCIES

  • Do engineers carry Gas Safe cards with the relevant training associated with the works being carried out?

  • Please Select (Multiple Selections are Available)

  • Please insert qualification:

  • Insert Comment:

  • Are electrical works being carried out by competent person's?

  • Please Select (Multiple Selections are Available)

  • Please insert accredited body:

  • Insert Comment:

  • Are there any Customer Care Issues?

CUSTOMER CARE (To be completed in all cases)

  • Property damage?

  • Damage to Property?

  • Defect
  • Insert Image:

  • Insert Comment:

  • Dust sheets used?

  • Installed in a neat and tidy manner?

  • Redundant materials removed?

  • Customer informed of works completed?

  • Customer advised of use of controls?

  • System flushed correctly?

  • Comments in relation to any item in this section.

  • Are any Follow Ups Required?

FOLLOW UP REQUIRED?

  • Remedial's required?

  • NO ACTION REQUIRED

  • Description of remedial works:

  • Insert Image of remedial works required.

  • Have the issues been notified to head office?

  • Who was this reported to?

  • Method of notification:

  • Date and Time Notified:

  • NOTIFY HEAD OFFICE AND REPORT

  • Do you require the occupant to sign this report?

DECLARATION - TO BE COMPLETED BY THE CUSTOMER

  • I agree that by signing this report I am happy that the inspection and works have been carried out to a satisfactory standard.

  • Customer Signature - Print & Sign

  • Date:

  • Do you require the assessor to sign the report?

SIGN OFF - TO BE COMPLETED BY THE ASSESOR

  • I the assessor have given a true and accurate account of the inspection and can confirm the installation is satisfactory and the customer is happy with the services received by our companies.

  • Assessor - Print & Sign

  • Date:

  • Is the occupant willing to rate the installation?

  • OCCUPANT HAS BEEN ASKED TO SUBMIT COMMENTS ON THE INSTALLATION HOWEVER THEY REFUSED

  • Have all works been completed to a satisfactory level?<br><br>

  • Please give details of where you feel you have not received a quality service.

  • Would you recommend us to others?

  • We are very sorry to hear this and apologise in advance for the issues you are not happy with.

  • Excellent.... Did you know you can earn money for referring to friends and family.

    Please ask the assessor for a leaflet to pass around.

  • Please rate us from 1 to 10 on the service you have received from start to finish.

  • Would you please be kind enough to write a few words for our testimonial page on our website?

  • Customer Testimonial:

  • PLEASE EMAIL THIS TO YOUR REPRESENTATIVE AT VALLEY SERVICES HEAD OFFICE.

    THIS REPORT FORMS PART OF THE QA AND HEALTH & SAFETY COMPLIANCE.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.