Title Page
PM PL02 - TMV - Thermostatic Mixing Valve Inspection
PM PL02 - TMV - Thermostatic Mixing Valve Inspection
Location
-
Date
-
Facility?
- POB - Port of Brisbane
- GCPH - Gold Coast Private Hospital
- QCH - Queensland Children's Hospital
- Scentre - Westfield Shopping Centre
- Ventia - State School
- CVSG - CV Services Group
- GCUH - Gold Coast University Hospital
- TDS - Tweed Day Surgery
- QPU - Queensland Police Union
- BAC01 - Brisbane Airport - ITB
- BAC02 - Brisbane Airport - DTB
- BACZZ - Brisbane Airport - Other
- MACG - McKenzie Aged Care Facility
- SCUH - Sunshine Coast University Hospital
- Spotless Defence - Amberley
- Spotless Defence - Enoggera
- Spotless Defence - Canungra
- Other
-
POB Precinct
- Fisherman Island
- Port Gate
- Port West
- Hamilton
- Pinkenba
- Port North
- Colmslie
-
QCH Facility
- QCH - Main Hospital
- CCHR - Children's Centre Health Research
- CHEP - Central Health Energy Plant
- FDN - Foundation Building
-
Scentre Westfield - Facility?
- Coomera
- North Lakes
- Carindale
- Chermside
- Chermside CHO & ATO
- Helensvale
- Garden City
- Other
-
Ventia State School - Facility?
- Coomera State School
- Murrumba State School
- Augusta State School
- Peregian State School
- Brightwater State School
- Bayview State School
- Woodlinks State School
-
Building Name and Number or Room Name?
-
Name of tradesperson
-
Job Number
-
Discipline?
-
Preventative Maintenance (PM) Inspection Type
-
Asset ID Number (include photo of Asset label with number/bar code where applicable)?
-
Asset Description?
-
Size/Capacity
-
Manufacturer?
-
Model Number?
-
Serial Number?
-
Year asset/equipment was installed (approximate)?
Pre-service Check
-
Hot water temperature °C
-
Hot Water Pressure Static
-
Cold water temperature °C
-
Hot Water Pressure Static
Fixtures served in order of pipe run
-
Low flow rate of warm water (one reading for all)
-
High flow temperature of warm water (one reading for all)
-
Thermal shutdown test pass/fail closest outlet
-
Is flow adequate with all fixtures operating
Service work
-
Check the operation of the non-return valve COLD
-
Check the operation of the non-return valve HOT
-
Clean out strainers/ de-scale the strainers
-
Remove the thermostatic element, disassemble, de-scale, clean, new orings
-
Inspect the body of the valve for signs of pitting, de-scale and clean
-
Correctly install thermostatic element into valve body
Commission the valve
-
Fixtures served in order of pipe run
-
Low flow rate of warm water (one reading for all)
-
High flow temperature of warm water (one reading for all)
-
Thermal shutdown test pass/fail closest outlet
-
Is flow adequate with all fixtures operating
Condition Assessment
-
Overall Condition Rating?
- P6 - Excellent (No Priority - monitor >10 years)
- P5 - Good (Low Priority - monitor >4 years)
- P4 - Fair (Medium Priority - Consider action 2-4 years)
- P3 - Poor (High Priority - Consider action 1-2 years)
- P2 - Very Poor (Urgent - Consider action 0-12 months)
- P1 - Dangerous (Emergency - Consider action 48hrs/0-6 months)
Repairs
-
Repairs and Repair Codes
-
Select Repair Code Where Applicable Needed for Repair/Replacement of Asset
-
Description of the defect with equipment/asset?
-
Work (labour and materials) needed to rectify defect?
-
Rectification due by (year)?
-
Estimated budget replacement cost (whole number only - no 'k')?
-
Take Photo (include photo of QR Code Asset Label)