Title Page

  • Site conducted

  • Prepared by

  • Location of Work

  • Reason for Work

  • Who is Undertaking the Work?

  • Company Name

  • Suitable Risk Assessment Provided?

  • School Site Team Members Name

  • Is Schools Generic Risk Assessment Suitable for the Task?

  • Has a Suitable Risk Assessment been Written?

  • Planned Permit Start Time

  • Planned Permit End Time

Work Type

  • Asbestos

  • Will Building Be Occupied During Work?

  • What precautions have been put in place to protect building users? (Barriers, closed areas, notifications etc)

  • What fibre containment control measures are contractor using? ( tents, enclosures, controlled drilling, air testing etc)

  • If work involves Asbestos removal, have electrical, water and fire systems been isolated?

  • Work at Hight (Over 2m or Roof)

  • Weather conditions Safe / Suitable?

  • What are the conditions?

  • Type of Access Equipment

  • Is LOLER in Date?

  • Is Access Equipment Suitible for Local Conditions (slopes, banks, soft soil etc)

  • Will Work Involve Going onto Roof?

  • Type of Edge Protection / Fall Arrest System Used?

  • Electrical

  • Lock Out / Tag Out System Used?

  • Works in Occupied Area / Kitchen? (loss of power to Fridges / Extraction etc)

  • What Control Measures in Place?

  • Confined Space (Loft, Manhole)

  • Lone Working?

  • List Control Measures in Place?

  • Emergency Rescue Plan Considered

  • What is Emergency Plan?

  • Hot Works (grinding, welding, soldering etc)

  • Is There Another Option Other Than Hot Works Availible?

  • If Non Hot Option Is Used No Permit Is Required

  • Fire Extinguishers Availible

  • 1 Hour Fire Watch Post Works

  • Combustible Materials Removed from Area?

  • In all Situations is the Works Area Suitably Barriered Off? (based on site users who are actually onsite)

  • List any Other Risks, Control Measures or Comments

Permit Opening Agreement

  • Contractor Signed

  • School Site Team Signed

  • Estates / SBM / HT Signed (Approver)

  • Approval Date & Time ( Approver)

Permit Closure

  • Contractor Signed

  • School Site Team Signed

  • Estates / SBM / HT Signed (Approver)

  • Permit Closure Date & Time (Approver)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.