Title Page
-
Inspector
-
Job Role
-
Project Reference
-
UPRN
-
Location
-
Contractor Inspected
-
OVO Project Manager
-
Contractor Site Representative
-
Date and Time of Inspection
-
Date of previous report (if applicable)
-
Actions closed out from previous report? (if applicable)
General Documentation and Site Setup
-
Construction Phase Plan (CPP) available?
-
Site specific RAMS (available / completed)?
-
Site specific POWRA? (available / completed)?
-
RAMS fit for purpose and implemented?
-
Evidence of site inductions for all on site?
-
OVO Safety Event Poster available? (completed and accurate)
-
Asbestos R&D survey carried out and available? (where applicable)
-
Asbestos effectively managed? (survey reports adequate, available and communicated, asbestos awareness training for all site operatives, emergency process understood, working areas checked)
-
COSHH assessments available?
-
PAT register and Calibration Log / evidence available and up to date?
-
Welfare Facilities (Schedule 2 CDM Regs 2015 Compliance) available? (refer to CIS59 for HSE guidance on welfare for transient projects)
-
Adequate number of first aider(s) / appointed persons on site?
-
Suitably stocked first aid kit available?
-
Suitable general fire precautions? (smoking areas, detection and alarm, extinguishers, marshals, assembly points)
-
Adequate site supervision? (SSSTS/ SMSTS qualified individual)
-
Safe Vehicle parking, loading / unloading, reverse parking at site?
-
Manual Handling effectively managed?
-
Adequate customer / general public safety considerations (vulnerable persons etc.)
-
Occupier/Tenant/Owner/responsible person advised on work, risk, hazards, safe zones etc.?
-
Adequate signage / barriers in place?
-
Safe systems of work in place for electrical work (Permit to work, evidence of procedure etc)?
-
Adequate clearances from overhead power cables?
-
Waste disposal controlled correctly?
-
Suitable rescue plan available for work in confined / restricted spaces?
-
Driveways, paths, gardens, public footpaths clear and clean?
-
Is site housekeeping acceptable? Dust sheets/ Roll and Stroll used throughout to protect the property?
-
Effective and safe working practices observed?
-
Materials stored safely?
-
Mandatory and task-specific PPE worn by all Operatives?
-
Power tools being used with RCD where applicable?
Site Observations
-
Please Describe an overview of the site ?(How the constructors have conducted themselves)
Signatures
-
Project Manager Signature