Title Page
-
Project No.
-
Contractor
-
Inspected by
-
Date
-
Property Identifier (will appear in Report Title)
-
Job No
-
Address
-
System Size
-
Panels
-
Inverter
-
Battery
Inspection
Array Installation
-
Do the installed solar panels match the design ?
-
Do the brackets for the array match the design ? (Correct number of brackets)
-
Have the tiles/slates been correctly seated after bracket install?
-
Have you identified any restrictions to the solar panels? e.g shading (trees, chimneys etc)
-
Has the bird protection been installed correctly ?
-
Is there any visible damage to the roof area?
-
Is there a minimum of 400mm free area around the array?
-
Are all DC cables installed on the roof securely fixed?
-
Has ventilation been provided behind array to prevent overheating/fire risk?
-
Is the array frame correctly fixed and stable/roof fittings weatherproof?
-
Do the DC cables enter into the roof space in the correct manner?
Installation of PV Equipment
-
Is the consumer unit installed with correct blank plates and the cable<br>entries suitably protected?
-
Does the consumer unit contain MCBS, RCBO and SPD of the same manufacturer as the consumer unit?
-
Have all labels/notices been installed in the correct position?
-
Has care been taken to install the PV equipment?
-
Is the system installed to avoid mutual detrimental influence?
-
Has the cable/containment been installed to building regs? (e.g fireproof clips/maintain fire integrity in walls/drilling of joists)
-
Have any screws penetrated through the rafters?
-
Can the lead operative confirm equipment & accessories are correctly connected, including use of MC4 crimper (panels, isolator switches, inverters etc)?
-
Have the conductors been connected and identified?
-
Is the internal equipment situated as per the design and accessible for operation, inspection and maintenance?
-
Is the equipment showing any signs of damage?
-
Has the inverter been mounted as per the manufacturer instructions, with suitable ventilation?
-
Has the battery been mounted as per the manufacturer instructions, with suitable ventilation?
-
Has the inverter and battery been earthed?
-
If installing PV equipment within a loft space, is there adequate boarding & access/egress arrangement in place for maintenance?
-
Where inverter and batteries are located within a loft space, or other rarely visited parts of the property, is suitable fire detection equipment installed and integrated with any existing detection and alarm systems?
-
Have the strings been adequately supported throughout the installation?
-
Are surge protection devices present?
-
Is there physical separation of AC and DC cables?
-
Is the AC isolator lockable in off position only?
-
Is the DC isolator fitted and lockable in off position only?
-
Are protection settings and installer details displayed?
-
Is the emergency shutdown procedure displayed?
-
Has a smoke detector been installed?
Customer Satisfaction
-
Did they arrive within the allocated time slot?
-
Did they introduce themselves in a polite and professional manner?
-
Was there scaffolding in place during the install?
-
Were any changes to the design explained by the installer on<br>the day of installation?
-
Have you identified any damage as a result of the installation?
-
Were you shown how to operate the system AC/DC isolators?
-
Is your system currently online and communicating with the<br>monitoring portal?
-
Were the work areas left clean and tidy following your<br>installation?
-
Has all the waste been removed from site?
-
Do you (customer) have any comments or feedback you would like to<br>share?
Summary of findings & PM actions to address any issues identified:
-
Additional Notes
-
Add media
-
Note - if an Unsatisfactory score is recorded during the inspection it must be brought to the attention of Site Management and if necessary, noted as a non-conformance. Written QA Inspections must be undertaken weekly and if quality issues are evidenced OVO staff must assume accountability for implementing an appropriate improvement plan.
Signatures
-
Project Manager Signature
-
All further works required have been completed. (Signature)