Title Page

  • Project No.

  • Contractor

  • Inspected by

  • Date

  • Property Identifier (will appear in Report Title)

  • Job No

  • Address
  • System Size

  • Panels

  • Inverter

  • Battery

Inspection

Array Installation

  • Do the installed solar panels match the design ?

  • Do the brackets for the array match the design ? (Correct number of brackets)

  • Have the tiles/slates been correctly seated after bracket install?

  • Have you identified any restrictions to the solar panels? e.g shading (trees, chimneys etc)

  • Has the bird protection been installed correctly ?

  • Is there any visible damage to the roof area?

  • Is there a minimum of 400mm free area around the array?

  • Are all DC cables installed on the roof securely fixed?

  • Has ventilation been provided behind array to prevent overheating/fire risk?

  • Is the array frame correctly fixed and stable/roof fittings weatherproof?

  • Do the DC cables enter into the roof space in the correct manner?

Installation of PV Equipment

  • Is the consumer unit installed with correct blank plates and the cable<br>entries suitably protected?

  • Does the consumer unit contain MCBS, RCBO and SPD of the same manufacturer as the consumer unit?

  • Have all labels/notices been installed in the correct position?

  • Has care been taken to install the PV equipment?

  • Is the system installed to avoid mutual detrimental influence?

  • Has the cable/containment been installed to building regs? (e.g fireproof clips/maintain fire integrity in walls/drilling of joists)

  • Have any screws penetrated through the rafters?

  • Can the lead operative confirm equipment & accessories are correctly connected, including use of MC4 crimper (panels, isolator switches, inverters etc)?

  • Have the conductors been connected and identified?

  • Is the internal equipment situated as per the design and accessible for operation, inspection and maintenance?

  • Is the equipment showing any signs of damage?

  • Has the inverter been mounted as per the manufacturer instructions, with suitable ventilation?

  • Has the battery been mounted as per the manufacturer instructions, with suitable ventilation?

  • Has the inverter and battery been earthed?

  • If installing PV equipment within a loft space, is there adequate boarding & access/egress arrangement in place for maintenance?

  • Where inverter and batteries are located within a loft space, or other rarely visited parts of the property, is suitable fire detection equipment installed and integrated with any existing detection and alarm systems?

  • Have the strings been adequately supported throughout the installation?

  • Are surge protection devices present?

  • Is there physical separation of AC and DC cables?

  • Is the AC isolator lockable in off position only?

  • Is the DC isolator fitted and lockable in off position only?

  • Are protection settings and installer details displayed?

  • Is the emergency shutdown procedure displayed?

Customer Satisfaction

  • Did they arrive within the allocated time slot?

  • Did they introduce themselves in a polite and professional manner?

  • Was there scaffolding in place during the install?

  • Were any changes to the design explained by the installer on<br>the day of installation?

  • Have you identified any damage as a result of the installation?

  • Were you shown how to operate the system AC/DC isolators?

  • Is your system currently online and communicating with the<br>monitoring portal?

  • Were the work areas left clean and tidy following your<br>installation?

  • Has all the waste been removed from site?

  • Do you (customer) have any comments or feedback you would like to<br>share?

Summary of findings & PM actions to address any issues identified:

  • Additional Notes

  • Add media

  • Note - if an Unsatisfactory score is recorded during the inspection it must be brought to the attention of Site Management and if necessary, noted as a non-conformance. Written QA Inspections must be undertaken weekly and if quality issues are evidenced OVO staff must assume accountability for implementing an appropriate improvement plan.

Signatures

  • Project Manager Signature

  • All further works required have been completed. (Signature)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.