Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Inlet flow switch
-
Check if operating (Green lights in use with flow - Red lights no flow & not open)
-
Check condition of Switch
DAF Pumps
-
Check Recycling Pump And Sludge Pumps are running in Auto on Panel
-
Check plumbing for leaks
-
Check recycling circuit plumbing is NOT hot
-
Check delivery of Sludge Pump to Black Storage Tank, ( Sludge and not water/light fluid).
-
Check and flush Black Sludge Tank drain off Valves (Bottom of Tank 2x Blue Ball valves)
Scrapper
-
Check free of any obstruction
-
Listen for any noises such as binding loose metal
-
(Weekly) Rinse paddles clean both sides<br>Check condition of Chain and drive cogs for wear.
-
(Weekly) Hose down Sludge Hopper to prevent build up and hose Weir clear of soilds
Air pressures
-
Flow Meter set to between 2 & 3 l/min
-
Regulator is set between 6.0 & 6.5
-
Air compressor is in auto and pressure is greater than Regulator.
-
Inlet pressure to DAF from recycling circuit optimum dwell point 500 kpa