Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Inlet flow switch

  • Check if operating (Green lights in use with flow - Red lights no flow & not open)

  • Check condition of Switch

DAF Pumps

  • Check Recycling Pump And Sludge Pumps are running in Auto on Panel

  • Check plumbing for leaks

  • Check recycling circuit plumbing is NOT hot

  • Check delivery of Sludge Pump to Black Storage Tank, ( Sludge and not water/light fluid).

  • Check and flush Black Sludge Tank drain off Valves (Bottom of Tank 2x Blue Ball valves)

Scrapper

  • Check free of any obstruction

  • Listen for any noises such as binding loose metal

  • (Weekly) Rinse paddles clean both sides<br>Check condition of Chain and drive cogs for wear.

  • (Weekly) Hose down Sludge Hopper to prevent build up and hose Weir clear of soilds

Air pressures

  • Flow Meter set to between 2 & 3 l/min

  • Regulator is set between 6.0 & 6.5

  • Air compressor is in auto and pressure is greater than Regulator.

  • Inlet pressure to DAF from recycling circuit optimum dwell point 500 kpa

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.